My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024 Annual Comp Plan Ordinance & Attached Exhibits
>
Meetings
>
2025
>
01. January
>
2025-01-07 10:00 AM - Commissioners' Agenda
>
2024 Annual Comp Plan Ordinance & Attached Exhibits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2025 12:35:08 PM
Creation date
1/2/2025 12:26:49 PM
Metadata
Fields
Template:
Meeting
Date
1/7/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Ordinance for the 2024 Annual Docket Amendments to the Comprehensive Plan
Order
12
Placement
Consent Agenda
Row ID
125743
Type
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Required Notice: Two working day notice prior to initial site work involving drainage and <br />installation of temporary water retention, detention and siltation control. <br />2. Inspection Details: To verify that temporary sedimentation and erosion control has been <br />installed in accordance with approved plans and these standards. Subsequent inspections <br />may be required at the discretion of the County Engineer as necessary to ensure <br />continued proper operation and maintenance of temporary sedimentation and erosion <br />control for the duration of construction. <br />C. Utility and Storm Drainage Installation: <br />1. Required Notice: Two working day notice prior to trenching and placing of storm <br />drainage systems. <br />2. Inspection Details: To verify that underground storm drainage facilities, including but not <br />limited to pipes, catch basins, and manholes have been constructed in accordance with <br />the approved plans and these standards. Inspection shall take place prior to backfill. If <br />cover is installed in stages, multiple inspections shall be scheduled as necessary to ensure <br />that all facilities receive inspection. <br />D. Utility and Storm -Drainage Backfill and Compaction: <br />1. Required Notice: Two working day notice before backfill and compaction of storm <br />drainage systems. <br />2. Inspection Details: Verify that backfill for all trenching within the roadway, existing right of <br />way, and future right of way is in compliance with the approved plans and these <br />standards. <br />E. Subgrade Completion: <br />1. Required Notice: Two working day notice at stage that underground utilities and roadway <br />grading are complete. <br />2. Inspection Details: To verify that the subgrade has been constructed and graded in <br />compliance with the approved plans and these standards. If the subgrade and surfacing is <br />installed in stages, multiple inspections shall be scheduled as necessary to ensure that all <br />subgrade has been inspected. <br />F. Crushed Surfacing Placement: <br />1. Required Notice: Two working day notice. <br />2. Inspection Details: To verify that crushed surfacing has been placed and compacted in <br />accordance with the approved plans, and these standards. If the scope of the project is <br />Title 12 Kittitas County Code I Draft No. 5 — Working Draft forAdoption 1011212023 <br />10C <br />
The URL can be used to link to this page
Your browser does not support the video tag.