Laserfiche WebLink
3. Culvert and drainage improvement plans and details for the approach location, <br />4. Map detailing utility locations before and after development in and along the road, <br />5. A subdivision zoning or development plan, <br />6. Property map indicating other access and abutting public roads and streets, and <br />C. The Department will work cooperatively with applicants when determining requirements on access <br />requests. Prior to issuing a denial on an access permit request, the Department shall attempt to <br />resolve the reasons for the denial with the applicant, <br />D. Any appeals of a denied access permit shall be resolved through the Administrative Decisions <br />Appeals process according to KCC 15A.07. <br />12.04.07.080 Permit Conditions and Requirements. <br />A. The specific requirements for construction of the driveway approach and driveway will be issued <br />to the permittee along with the driveway approach permit. <br />B. The permittee will have 12 months from the date of issuance, as shown on the permit, to <br />complete construction of the driveway and request inspection by the Department, unless a <br />building permit is open, then expiration will run concurrent with building permit expiration date. <br />C. An extension to the access permit will only be considered if construction of the approach and <br />driveway has been substantially completed and the extension request is made prior to the permit <br />expiration date. The permittee can request an extension to the Department in writing. The <br />Department will determine if the approach has been substantially completed and determine the <br />length of the extension, if granted. <br />D. The expected dates of construction and expected use of the driveway access shall be included on <br />driveway access permit application. The permittee shall notify the Department at least 48 hours <br />prior to any construction in County right-of-way. <br />E. The Department shall inspect the driveway access and the driveway upon completion of <br />construction to ensure that all terms and conditions of the permit are met. The Department may <br />request to inspect the driveway access during construction. <br />Title 12 Kittitas County Code I Draft No. 5 — Working Draft for Adoption 1011212023 <br />70 <br />