My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024 Annual Comp Plan Ordinance & Attached Exhibits
>
Meetings
>
2025
>
01. January
>
2025-01-07 10:00 AM - Commissioners' Agenda
>
2024 Annual Comp Plan Ordinance & Attached Exhibits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2025 12:35:08 PM
Creation date
1/2/2025 12:26:49 PM
Metadata
Fields
Template:
Meeting
Date
1/7/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Ordinance for the 2024 Annual Docket Amendments to the Comprehensive Plan
Order
12
Placement
Consent Agenda
Row ID
125743
Type
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Culvert and drainage improvement plans and details for the approach location, <br />4. Map detailing utility locations before and after development in and along the road, <br />5. A subdivision zoning or development plan, <br />6. Property map indicating other access and abutting public roads and streets, and <br />C. The Department will work cooperatively with applicants when determining requirements on access <br />requests. Prior to issuing a denial on an access permit request, the Department shall attempt to <br />resolve the reasons for the denial with the applicant, <br />D. Any appeals of a denied access permit shall be resolved through the Administrative Decisions <br />Appeals process according to KCC 15A.07. <br />12.04.07.080 Permit Conditions and Requirements. <br />A. The specific requirements for construction of the driveway approach and driveway will be issued <br />to the permittee along with the driveway approach permit. <br />B. The permittee will have 12 months from the date of issuance, as shown on the permit, to <br />complete construction of the driveway and request inspection by the Department, unless a <br />building permit is open, then expiration will run concurrent with building permit expiration date. <br />C. An extension to the access permit will only be considered if construction of the approach and <br />driveway has been substantially completed and the extension request is made prior to the permit <br />expiration date. The permittee can request an extension to the Department in writing. The <br />Department will determine if the approach has been substantially completed and determine the <br />length of the extension, if granted. <br />D. The expected dates of construction and expected use of the driveway access shall be included on <br />driveway access permit application. The permittee shall notify the Department at least 48 hours <br />prior to any construction in County right-of-way. <br />E. The Department shall inspect the driveway access and the driveway upon completion of <br />construction to ensure that all terms and conditions of the permit are met. The Department may <br />request to inspect the driveway access during construction. <br />Title 12 Kittitas County Code I Draft No. 5 — Working Draft for Adoption 1011212023 <br />70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.