My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-10-28-minutes-public-works-and-cds-study-session
>
Meetings
>
2024
>
11. November
>
2024-11-19 10:00 AM - Commissioners' Agenda
>
2024-10-28-minutes-public-works-and-cds-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 1:04:02 PM
Creation date
11/14/2024 1:00:08 PM
Metadata
Fields
Template:
Meeting
Date
11/19/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
124307
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• County will assist in gathering contact information for outside service providers and assist <br />with contact for information for CPF. <br />• Assumes keeping current CFP format and just updating the information in the Plan <br />consistent with GMA. <br />• The consultant team will support the County to distribute LCA results at the Transportation <br />Analysis Zone (TAZ) level including 2046 growth projections for CFP needs. <br />• The consultant team will work with the County to distribute TAZ analysis to service providers <br />for the 6- and 20-year CFP. <br />• County will assist with assumptions for 6-year financing plan. <br />Task 11: SEPA <br />Task will include defining the proposal including any policy and code changes and prepare a SEPA <br />Checklist and draft Determination of Non -Significance for County review. Individual docket reviews <br />are not anticipated. An expanded checklist is assumed and would include technical evaluations <br />developed for the Comprehensive Plan Update (e.g. needs and trends for elements, transportation <br />modeling results) issuance. We will prepare a revised checklist and notice for County issuance, <br />and two rounds of review are assumed for this documentation. <br />Proposed Deliverables: <br />Preparation of public notices in coordination with the county. <br />Preparation of Determination of non -significance <br />Draft and final SEPA documents <br />Assumptions: <br />Consultant will prepare a revised checkiist and notice for County issuance, and two rounds <br />of review are assumed for this documentation. <br />Task 12: Final Comprehensive Plan <br />The Task will include an updated Plan which responds to comments on the review of the draft <br />Comprehensive Plan. We will continue to adjust the Comprehensive Plan as needed as the plan <br />moves through the adoption process. <br />Detiverabtes: <br />• Update draft comprehensive plan based upon comments from the county and in response <br />to public comments received. <br />• Prepare technical memos as needed for the record to support adopted of the Plan. <br />• Update Draft CFP. <br />• Include new and revised policies as needed to respond to comments and build the record. <br />• Create a response to public/agency comment response. <br />• Supply the county with a final comprehensive plan for adoption. <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.