My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finalized Contract Agreement Packet
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
Finalized Contract Agreement Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 12:50:20 PM
Creation date
10/8/2024 12:48:44 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall be continued throughout the courses or parts in which it occurs and shall also apply to all other similar <br />parts in the work unless otherwise indicated. <br />Drawings are in general diagrammatic and do not necessarily show complete details of the work, or materials, <br />and do not necessarily show the construction sequence that may affect the Contractor means and methods. <br />The Contractor shall coordinate to sequence the parts to a completed whole. <br />Add the following Subparagraphs 1.2.4 through L.2.6to 7.2: <br />I.2.4 Conditions of the Contract shall be read by all prime contractors and by each <br />subcontractor or sub-subcontractor and shall be considered a part of each section <br />of the Technical Specifications. Provisions of Contract Documents are binding on <br />the contractors, subcontractor and sub-subcontractors for all work shown or <br />indicated on the original Contract Documents plus any additional work authorized <br />by change order, interpretation or field orders. <br />1.2.5 The Contractor shall notify the Architect of any condition he finds where, in his <br />judgment, it will be desirable to modify the requirements to produce the best <br />results. lf the Contractor fails to make such request, he is deemed to have accepted <br />the specified and/or detailed method of installation as being adequate to produce <br />first class, satisfactory work. Should conflict occur in or between drawings and <br />specifications, the Contractor is deemed to have estimated on the more expensive <br />way of doing the work unless he shall have asked for, and obtained a written <br />decision seven (7) calendar days before submission of proposal as to which method <br />or materials will be required. Manufacturer's equipment specifications are based <br />on models and/or construction and installation methods prevailing at the date of <br />invitation and/or advertisement to submit to manufacturer's model and/or <br />construction changes and other variations from the items specified shall be <br />furnished and installed at no additional cost to Owner. <br />1.2.6 Requests by the Contractor for written interpretations and/or detail drawings shall <br />be made to the Architect in a timely manner such as will allow ample time for their <br />preparation and delivery without causing delays in the work. Failure of the <br />Contractor to request needed clarifications and/or his proceeding with affected <br />work prior to receiving same shall indicate his acceptance of any and all costs <br />and/or delays required on account of necessary corrections. <br />ARTICLE 2. OWNER <br />2.2.5 DELETE as published and insert as follows: <br />2.2.5The Contractor will be furnished free of charge 5 copies of Drawings and Project Manuals. <br />Additional sets will be furnished at the cost of reproduction, postage and handling. <br />ARTICLE 3 - CONTRACTOR <br />3.2.1 ADD the following text: <br />lf the Contractor observes any errors, discrepancies or omissions in the Contract <br />Documents, he shall promptly notify the Architect, requesting clarification. lf the <br />Contractor proceeds with Work affected by such errors, discrepancies or omissions <br />without receiving such clarification, he does so at his own risk. Any adjustments <br />involving such circumstances made by the Contractor, priorto approval by the <br />Kittitas County - Lower Valley <br />Transfer Station <br />Supplementary General <br />Conditions of the Contract <br />June 18, 2024 <br />2o124
The URL can be used to link to this page
Your browser does not support the video tag.