My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finalized Contract Agreement Packet
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
Finalized Contract Agreement Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 12:50:20 PM
Creation date
10/8/2024 12:48:44 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TOWER VALLEY TRANSFER STATION <br />RESPONSE TO RFI qUESTIONS - August 1,2024 <br />sEcllor{OAIE RECIEI'ED I RftquEnoil RESPOIIEI <br />The cwB products that I would expectto use on a project llke thlt would include: <br />Georgla Pacific5/8'TypeX GWB at all locetions other than what I list below. <br />G€orgia Pacific 5/8" Tilebacker - at all locatlons scheduled to recelve wall tile. (Shown in <br />restrooms only to 5'AFF.) <br />Georgia Pacific 5/8" Mold Guard paperfaced GWB- in wet areas as defined ln 092900 1.03A. <br />Abuse and/or lmpact Reslgtant GWB -This would only be at speclfied areas, of whlch I cannot <br />find. This s€ems like an unusua I produd for thil type of project, and I would prefer to exclude this <br />produd unlesswe can determine where itis needed. <br />Fib€rglass Faced GWB such as Georgia Pacific Dens Armour/USG Flb€rock Aqua Tough -this <br />would typically be called outin ertremelywet areas, or areas wh€re we would be hanSing GWB <br />prlortothebuildingbeingddedln. OrperhapsahlShhumidityareasuchasanindoorpool.l <br />would preferto exclude thb producl unless we aan determine whe.e it is needed. <br />092900 3.010.2.a -Calls for Level 5 atall surfaces exposed to viewthatare to receive p.int. <br />Se€ms exp€nsive and strange Siven the type ofbuildings these are, but I will tiSure a l€vel 5 flnish, <br />unlesr you direct me otherulse. <br />095100 - The fln ish schedules identify ACT-1 at all locations s.heduled to receive ACT. The <br />OgslOOspeciticationldentitles3difterenttypesofACT. WheredoweidentifywhlchtileisACf-l? <br />Ir it corectthatthere is only 1 tvpe ofACTon thls proied? <br />O951OO & O953OO - lt may be too late, butwewould be able to offer a significantsavlnSs of, the <br />ACTpackaSeifCenainte€dACTcompa.ableproductswouldbeacceptable. (lfyoucan(onflrm <br />the desiredACTproduct, we can offera VE deduct ifthere is a Cedainteed comparable tile and <br />Srid product ifthatworkg foryou.) <br />7 l2sl2o24 67 <br />on plan page C8 there h a note sayinS thatthere needs to be Thermoplasticstop Bari at all sToP <br />signs. WhGrcarewesupposetoputtheseinthebldtab? ThereisonlyooubleYellowandSingle <br />whate strlping bid items, <br />This item can be add€d to 8id Base ltem 115 _ Site si8na8e. <br />7 /2s12O24 68 <br />l.lsinsulationrequi.edonthetrahsferltationandtheMRWbullding? lfsowhatisrequiredand <br />where is it located? (see recommendations below) <br />2. What paint speciflcally i5 tequired for all structural steel located attheTransferStatlon and <br />MRW Suildings? <br />lnsulation 13 requircd per Wall Secllons 5/A1-A501, 7 1A1-A501, 2lA4-A5Ol, <br />and 3/A4-A501, Structural steel palnt requiremenls added toAddendum No. <br />4. <br />Add the followinS to sedion 09 96 002.01 e AccEPTABIE MANUFACTURERS <br />gasis of DeslSnr Supply SheNin-Wllli.ms Compsny producB indlcated or <br />.omparable p.oduds from thoselisted below: <br />Steel Substates: PiSmented PolYurethane over Epoxy System <br />1. Prime coeti Epoxy, high-build, low Sloss: <br />1st coat: S"w Macropoxy 646-100 Fast cure €pory, 858 series (7 0-13,5 <br />mils wet,5.0-10.0 mlls dry percoat. <br />2. lntermediate Coat: S"W Hl-Solids Polyurethane Semi-Gloss, 965_350 Series <br />3. Topcoat: Polyurcthane, Mo-component, Pigmented, glosil <br />S.W Hi-Solids PolyurethaneSemlclots,965'350Series. {4 5'8 0 ilils wet, <br />3.0-5.0 mils dry percoat. <br />4. €poxy Prlmer: lstCoati <br />a. lfthe m€tal does not have a zinc rich primer already applled, u5e the <br />lollowingas a firststep: <br />b. S-WCorothane I GalvaPac2K Zlnc-Rlch Primer g5SG10 (3.0-4.0 mils drY) <br />Metal: <br />5. Miscellaneous, Ferrous Metal, Raillngs <br />a. Waterbased: Semicloss FInirh: 1!t Coat: S_W Pro lndustrial Pro-Cryl <br />universal Primer, 856-1310 Serlet (5.0 mils wel 2 0 mils dry) <br />2nd coat: s-w Pro lndustrlal waterbased Alkyd urethane €namcl semi_ <br />Gloss, 853-1150serie5. <br />3rd Coat: S-W Pro lndustrlal W.terbased Alkyd Urethane Enamel Semi' <br />Gloss,853-1150 series {4,0-5,0 mils wet, 1 4'1.7 milsdryper coat) <br />6. Manufadurec: Subject to compli.nce with requi.ements, provide producs <br />bV one ofthe followingr <br />lnternational Prot*tlve Coatinas; AkzoNobel. <br />PPG Paints; PPG lndustrles, lnc. <br />nust-OIeum Conohtlon; a subsldiary of RPM Internationrl, lna. <br />5heilin-Wlllams Company {Thel. <br />TnemecCompany, lnc. <br />1 l2sl2o24 69 Wlll the sloping or shoringarea necessary fo. the deep excavatlons be included in the sorueyed <br />calculatlon forpayment? That soil r€moved forsloping paid as unluitable sollt? <br />RFI spreadsheet- No.35 responJe addrcsses un9litablesoil payment: <br />The contraator shall perform a topographicsurueVforeach unsuilable soil <br />aemoval area prlorto stadine exaavation, oncetheexcavation is completg <br />the aontradorwill perform a final topographlcsuruey!nd will be paid based <br />on thesoil removed.nd topoSraphic surueys. Common lill will be calculated <br />7/2612024 10 <br />lust curious itthe strudured aabling (volce/data/iberl 15 beingprovided byowner? I have an <br />el€drical aontractorwho ir requestinS a bid on that podion ofthework and I don't se€ any <br />specificatlons (olv. 27ooo). Pleate let me know a5 soon as posiible beings the bid ls due on the <br />3oth. lf$eownerisprovidingthl5workcouldyoupleasefodardmyinfordationtothem, <br />thanks. <br />Yes, cabling wlll be provided byowner <br />thl2024
The URL can be used to link to this page
Your browser does not support the video tag.