Laserfiche WebLink
TOWER VALLEY TRANSFER STATION <br />RESPONSE TO RFI qUESTIONS - August 1,2024 <br />sEcllor{OAIE RECIEI'ED I RftquEnoil RESPOIIEI <br />The cwB products that I would expectto use on a project llke thlt would include: <br />Georgla Pacific5/8'TypeX GWB at all locetions other than what I list below. <br />G€orgia Pacific 5/8" Tilebacker - at all locatlons scheduled to recelve wall tile. (Shown in <br />restrooms only to 5'AFF.) <br />Georgia Pacific 5/8" Mold Guard paperfaced GWB- in wet areas as defined ln 092900 1.03A. <br />Abuse and/or lmpact Reslgtant GWB -This would only be at speclfied areas, of whlch I cannot <br />find. This s€ems like an unusua I produd for thil type of project, and I would prefer to exclude this <br />produd unlesswe can determine where itis needed. <br />Fib€rglass Faced GWB such as Georgia Pacific Dens Armour/USG Flb€rock Aqua Tough -this <br />would typically be called outin ertremelywet areas, or areas wh€re we would be hanSing GWB <br />prlortothebuildingbeingddedln. OrperhapsahlShhumidityareasuchasanindoorpool.l <br />would preferto exclude thb producl unless we aan determine whe.e it is needed. <br />092900 3.010.2.a -Calls for Level 5 atall surfaces exposed to viewthatare to receive p.int. <br />Se€ms exp€nsive and strange Siven the type ofbuildings these are, but I will tiSure a l€vel 5 flnish, <br />unlesr you direct me otherulse. <br />095100 - The fln ish schedules identify ACT-1 at all locations s.heduled to receive ACT. The <br />OgslOOspeciticationldentitles3difterenttypesofACT. WheredoweidentifywhlchtileisACf-l? <br />Ir it corectthatthere is only 1 tvpe ofACTon thls proied? <br />O951OO & O953OO - lt may be too late, butwewould be able to offer a significantsavlnSs of, the <br />ACTpackaSeifCenainte€dACTcompa.ableproductswouldbeacceptable. (lfyoucan(onflrm <br />the desiredACTproduct, we can offera VE deduct ifthere is a Cedainteed comparable tile and <br />Srid product ifthatworkg foryou.) <br />7 l2sl2o24 67 <br />on plan page C8 there h a note sayinS thatthere needs to be Thermoplasticstop Bari at all sToP <br />signs. WhGrcarewesupposetoputtheseinthebldtab? ThereisonlyooubleYellowandSingle <br />whate strlping bid items, <br />This item can be add€d to 8id Base ltem 115 _ Site si8na8e. <br />7 /2s12O24 68 <br />l.lsinsulationrequi.edonthetrahsferltationandtheMRWbullding? lfsowhatisrequiredand <br />where is it located? (see recommendations below) <br />2. What paint speciflcally i5 tequired for all structural steel located attheTransferStatlon and <br />MRW Suildings? <br />lnsulation 13 requircd per Wall Secllons 5/A1-A501, 7 1A1-A501, 2lA4-A5Ol, <br />and 3/A4-A501, Structural steel palnt requiremenls added toAddendum No. <br />4. <br />Add the followinS to sedion 09 96 002.01 e AccEPTABIE MANUFACTURERS <br />gasis of DeslSnr Supply SheNin-Wllli.ms Compsny producB indlcated or <br />.omparable p.oduds from thoselisted below: <br />Steel Substates: PiSmented PolYurethane over Epoxy System <br />1. Prime coeti Epoxy, high-build, low Sloss: <br />1st coat: S"w Macropoxy 646-100 Fast cure €pory, 858 series (7 0-13,5 <br />mils wet,5.0-10.0 mlls dry percoat. <br />2. lntermediate Coat: S"W Hl-Solids Polyurethane Semi-Gloss, 965_350 Series <br />3. Topcoat: Polyurcthane, Mo-component, Pigmented, glosil <br />S.W Hi-Solids PolyurethaneSemlclots,965'350Series. {4 5'8 0 ilils wet, <br />3.0-5.0 mils dry percoat. <br />4. €poxy Prlmer: lstCoati <br />a. lfthe m€tal does not have a zinc rich primer already applled, u5e the <br />lollowingas a firststep: <br />b. S-WCorothane I GalvaPac2K Zlnc-Rlch Primer g5SG10 (3.0-4.0 mils drY) <br />Metal: <br />5. Miscellaneous, Ferrous Metal, Raillngs <br />a. Waterbased: Semicloss FInirh: 1!t Coat: S_W Pro lndustrial Pro-Cryl <br />universal Primer, 856-1310 Serlet (5.0 mils wel 2 0 mils dry) <br />2nd coat: s-w Pro lndustrlal waterbased Alkyd urethane €namcl semi_ <br />Gloss, 853-1150serie5. <br />3rd Coat: S-W Pro lndustrlal W.terbased Alkyd Urethane Enamel Semi' <br />Gloss,853-1150 series {4,0-5,0 mils wet, 1 4'1.7 milsdryper coat) <br />6. Manufadurec: Subject to compli.nce with requi.ements, provide producs <br />bV one ofthe followingr <br />lnternational Prot*tlve Coatinas; AkzoNobel. <br />PPG Paints; PPG lndustrles, lnc. <br />nust-OIeum Conohtlon; a subsldiary of RPM Internationrl, lna. <br />5heilin-Wlllams Company {Thel. <br />TnemecCompany, lnc. <br />1 l2sl2o24 69 Wlll the sloping or shoringarea necessary fo. the deep excavatlons be included in the sorueyed <br />calculatlon forpayment? That soil r€moved forsloping paid as unluitable sollt? <br />RFI spreadsheet- No.35 responJe addrcsses un9litablesoil payment: <br />The contraator shall perform a topographicsurueVforeach unsuilable soil <br />aemoval area prlorto stadine exaavation, oncetheexcavation is completg <br />the aontradorwill perform a final topographlcsuruey!nd will be paid based <br />on thesoil removed.nd topoSraphic surueys. Common lill will be calculated <br />7/2612024 10 <br />lust curious itthe strudured aabling (volce/data/iberl 15 beingprovided byowner? I have an <br />el€drical aontractorwho ir requestinS a bid on that podion ofthework and I don't se€ any <br />specificatlons (olv. 27ooo). Pleate let me know a5 soon as posiible beings the bid ls due on the <br />3oth. lf$eownerisprovidingthl5workcouldyoupleasefodardmyinfordationtothem, <br />thanks. <br />Yes, cabling wlll be provided byowner <br />thl2024