Laserfiche WebLink
nEsFot{sE$gnoN OAIE RECIE!'ED t EH QUESflOtI <br />The feeder callout 109 is pafr ofthe future expaniion, whlch is not part of thi5 <br />contract,Sheet E100 7 12212024 58 <br />Sales Eulldlng (PP-Sales): <br />The Sal€s guilding irn't marked with Constructlon Note 3 for future expansion Additionally, there <br />is a feeder<allout 109 torlhls circuit, butthere is no ta8 109 on the site plan9. Could we please <br />clarifywhetherthls conduit needs to be run sonewhe.€ on the slte plans 8100? <br />(2Ol 500 Mctvl At Conductors in (2) S" conduits. (12) 500 MCM in (1) 5" and <br />{8} soOMCM in a {1) 6" conduit. (NoTE: the contractorcan p.ovideother <br />combinations ofwire and cabling as long a5 it satlsfies the NEC.) <br />Sheet E502 7 12212024 s9 <br />Clariflcation on Feeder 105 on E602: <br />Could we please getclarification on calloutfeeder 106 on E602? 0o theywant 7-5" conduits <br />wlth 3xS00 kcmil? <br />Electric Fire Pump ls future and there are no conduits/wircs. The lrain <br />Switahboard shall be equipped wlth connection lugs to accommodate the <br />futurc Electric Fire Pump. <br />Sheet E701 7 12212024 50 <br />tke Pump Conduit She: <br />Whatsize conduitis rcquited torthe fire puop? Construction Note 2 on plan 8701 mentions <br />underground condultg, and we assome it is 6" based on other 6" undeEround conduiB Could <br />you please confirm? <br />Yes. asphalt pavinB is required ln the rerycling centersheet c3 7 12212024 6T <br />On plan sheet C3, the4" thick pavementhatchlnS 15 shown goingthrou8h the recyclinSaent€r. see <br />the red clouded area in the snip below. Pleate conlirm this area slll receive asphalt pavement. <br />No asphalt paving required within the MRW buildlnS. This erea in the MRW <br />buildingwill be construded of a concrete slab.62 <br />Also on plan sh€etC3, the4" thlck pavement hatchinS ls shown Soing throlgh the MRW bulldlnS <br />seethe Sreen clouded area in the 5nip below. HoweveL in the strudu€l plan5. lhe MRw building <br />is shown with a slab lloor. Please confirm whelherthis..ea will receive asphalt pavement <br />SheetC3 7 122/2024 <br />Eiplosion proofheat detection works as well and rhould be pad ofthe Fire <br />Specialists desiSn ba!ed on the pedormance5pe.ill.ationt. <br />since thls i5 a performance speclfication, codeminimum will work for ho.n <br />The quantities and location of the fire alarm equlpmenta.e an estlmate in the <br />desjgn and aredependent upon the Washin8ton State Cenified Alarm <br />Speciallst that wlll detail the entire rystem durinS aon*rudion. <br />63 <br />AlsotheMRwbuildinghasanoteaboutbeingexplosionproofatleastoutinthemainarea lfsq <br />you would most likely notwant smoke and heatdetection on thecelling as smokesthat are <br />explosion proofaae4k each my cost, heat detecto.s are notas b.d as they run around 300 each. <br />Also, theyshow a huge numbetofhorn strobes in therq more than needed and those are verv <br />expensive es well. I just need to know lfwe can do code nlnlmum or if All those devices are <br />actuallyexplosion proof. I left another messaSe todaywlth your firm. <br />7 12212024 <br />The onlv location on the projedwhere curb and Suttea ls requk€d {oelail A or <br />C-9) is along the sloped access road le.ding intothetFn5fer building Curb <br />end Bunerwill be r€quired on both 5ide5 ofthetransfer buildlng access roed <br />st.ning at the entrance to the kansfer bulldlng nodh for 235 lf {470 lftotal). <br />sheetca 7/2412024 64 <br />Sheet c9 Detail A,/C9 5hows a road section with curb & 8ufte. on both sldes. Note below says <br />'transfe.bulldingnorthentranceandexlt'. Thepl.nsheeBforthisarsadonotappeartoshowa <br />cu.borhavecallouttothlsdetall. Canyouclarifywherqifany,concretecurbandEufterwould <br />be located? <br />SpecSection 10 81 12- Blrd Control oevices- <br />Delete paragraphe 1.3 Slrd Nenlng, 2.01c Blrd NettlnS, and 2.03 sird Nefring <br />Herdwere <br />10 81 12 7/2412024 55 Spec Sectlon 10 81 12- gkd Control Devices_ Whatarethe locations and llmits fo. the bid nettingi <br />LOWER VALLEY TRANSFER STATION <br />RESPONSE TO RFI QUESTIONS - August 1,2024 <br />StructuraldrawingsshowwoodtraminS. Architectuhlshowsamixofsteelstudandwood <br />f.amin& but the wall types page AOO9 shows all steel stud framihs Fuilher, there is no 054000- <br />speaification section, which ls typically whe.ewewould 5ee lhe exteriorwall or load bearinS <br />frahlng. There is a 092216 non-structural metal stud framlng specificatlon, but it does not <br />referencethefremingofexterlorwall5. lsthereanymeblstudframinSonthisproied? <br />GWB specification includes meny differenttypes ofGWB, some whlch come at a much hlSher <br />priceperst. lcannotflndanywhereinthedrawlngsthatidentlfieswheretouleeachdifferent <br />type ofGWS. Some ofthe aoncerning GWg products includei <br />0929002.028-(68)5/8lTypeC-thisboardi5typi.allyusedinspeciflclJLassemblies. lamnot <br />saelng .ny fire rated GWB assemblie5 id these buildinSs. Al5o, note 5 on the Agsembly pege A009 <br />dlreds me to use a more standard 5/8" Type X GWB product. <br />092900 2.028.5 -(WRGB) USG FiberockAqua-Tou8h -This produddoes match the d€scription. <br />This i5 not a paper fac€d product, and therefore requires siSnitlcantwork to finish- <br />O929OO 2.028.5 (Pan 2) {FRX-G) - lmpact Resistant GWB -where is this located? <br />092900 2.02C- Coatad Tile backer boaad and underlayment_ UsG Fiberock Sackerboard-l wlll <br />quallry. GP Denshield Tilebacker. <br />O929OO 2.020 - Cem€nt gackea Board - thls 5hows 5/8" Wallboard, %" Floorin8 lnde.layment- <br />theydo not identlfya p.odud, and I would be excludlng flooring underlayment. <br />0929002.2€-LirtsGypsheathingasbelnginspecsectlon061000 Spe.OS1000doesnotshow <br />gyp sheathing, I would be excludlnS all €xterior sheathln8. <br />092900 2.2F -Abuse Resistant Panels (ARP) -where is this located? <br />092900 3-01.15 - Instrucb u5 to use WRGB in wet locations notscheduled to receive tite fintsh or <br />(ARP). <br />O929OO 3.01.16- lnstruats us to use Coated Fiber-faaed Gypsum Board ln areas scheduled to <br />No.4 for changes to Section 09 29 00. <br />Relerto structural for exteriorwall framlngatAdmin and Saalehouse {Wood <br />framed). Assembly lypes shown on page A009 that arekeyed to Admin, <br />Scalehousq MRW and T.asfer Euilding are shown to indicate 8€neral design <br />intent includinS Insutatlon and energycode requlrenents. All elemenb of <br />Mnw and Transfer bullding to be deslgned by PEMB MFR, ste€l stud franing <br />is not required. <br />Provide flat bar becking per E,3b, Othea backing ls provided as an option to <br />the contractor, <br />4 8lu2024