My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finalized Contract Agreement Packet
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
Finalized Contract Agreement Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 12:50:20 PM
Creation date
10/8/2024 12:48:44 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nEsFot{sE$gnoN OAIE RECIE!'ED t EH QUESflOtI <br />The feeder callout 109 is pafr ofthe future expaniion, whlch is not part of thi5 <br />contract,Sheet E100 7 12212024 58 <br />Sales Eulldlng (PP-Sales): <br />The Sal€s guilding irn't marked with Constructlon Note 3 for future expansion Additionally, there <br />is a feeder<allout 109 torlhls circuit, butthere is no ta8 109 on the site plan9. Could we please <br />clarifywhetherthls conduit needs to be run sonewhe.€ on the slte plans 8100? <br />(2Ol 500 Mctvl At Conductors in (2) S" conduits. (12) 500 MCM in (1) 5" and <br />{8} soOMCM in a {1) 6" conduit. (NoTE: the contractorcan p.ovideother <br />combinations ofwire and cabling as long a5 it satlsfies the NEC.) <br />Sheet E502 7 12212024 s9 <br />Clariflcation on Feeder 105 on E602: <br />Could we please getclarification on calloutfeeder 106 on E602? 0o theywant 7-5" conduits <br />wlth 3xS00 kcmil? <br />Electric Fire Pump ls future and there are no conduits/wircs. The lrain <br />Switahboard shall be equipped wlth connection lugs to accommodate the <br />futurc Electric Fire Pump. <br />Sheet E701 7 12212024 50 <br />tke Pump Conduit She: <br />Whatsize conduitis rcquited torthe fire puop? Construction Note 2 on plan 8701 mentions <br />underground condultg, and we assome it is 6" based on other 6" undeEround conduiB Could <br />you please confirm? <br />Yes. asphalt pavinB is required ln the rerycling centersheet c3 7 12212024 6T <br />On plan sheet C3, the4" thick pavementhatchlnS 15 shown goingthrou8h the recyclinSaent€r. see <br />the red clouded area in the snip below. Pleate conlirm this area slll receive asphalt pavement. <br />No asphalt paving required within the MRW buildlnS. This erea in the MRW <br />buildingwill be construded of a concrete slab.62 <br />Also on plan sh€etC3, the4" thlck pavement hatchinS ls shown Soing throlgh the MRW bulldlnS <br />seethe Sreen clouded area in the 5nip below. HoweveL in the strudu€l plan5. lhe MRw building <br />is shown with a slab lloor. Please confirm whelherthis..ea will receive asphalt pavement <br />SheetC3 7 122/2024 <br />Eiplosion proofheat detection works as well and rhould be pad ofthe Fire <br />Specialists desiSn ba!ed on the pedormance5pe.ill.ationt. <br />since thls i5 a performance speclfication, codeminimum will work for ho.n <br />The quantities and location of the fire alarm equlpmenta.e an estlmate in the <br />desjgn and aredependent upon the Washin8ton State Cenified Alarm <br />Speciallst that wlll detail the entire rystem durinS aon*rudion. <br />63 <br />AlsotheMRwbuildinghasanoteaboutbeingexplosionproofatleastoutinthemainarea lfsq <br />you would most likely notwant smoke and heatdetection on thecelling as smokesthat are <br />explosion proofaae4k each my cost, heat detecto.s are notas b.d as they run around 300 each. <br />Also, theyshow a huge numbetofhorn strobes in therq more than needed and those are verv <br />expensive es well. I just need to know lfwe can do code nlnlmum or if All those devices are <br />actuallyexplosion proof. I left another messaSe todaywlth your firm. <br />7 12212024 <br />The onlv location on the projedwhere curb and Suttea ls requk€d {oelail A or <br />C-9) is along the sloped access road le.ding intothetFn5fer building Curb <br />end Bunerwill be r€quired on both 5ide5 ofthetransfer buildlng access roed <br />st.ning at the entrance to the kansfer bulldlng nodh for 235 lf {470 lftotal). <br />sheetca 7/2412024 64 <br />Sheet c9 Detail A,/C9 5hows a road section with curb & 8ufte. on both sldes. Note below says <br />'transfe.bulldingnorthentranceandexlt'. Thepl.nsheeBforthisarsadonotappeartoshowa <br />cu.borhavecallouttothlsdetall. Canyouclarifywherqifany,concretecurbandEufterwould <br />be located? <br />SpecSection 10 81 12- Blrd Control oevices- <br />Delete paragraphe 1.3 Slrd Nenlng, 2.01c Blrd NettlnS, and 2.03 sird Nefring <br />Herdwere <br />10 81 12 7/2412024 55 Spec Sectlon 10 81 12- gkd Control Devices_ Whatarethe locations and llmits fo. the bid nettingi <br />LOWER VALLEY TRANSFER STATION <br />RESPONSE TO RFI QUESTIONS - August 1,2024 <br />StructuraldrawingsshowwoodtraminS. Architectuhlshowsamixofsteelstudandwood <br />f.amin& but the wall types page AOO9 shows all steel stud framihs Fuilher, there is no 054000- <br />speaification section, which ls typically whe.ewewould 5ee lhe exteriorwall or load bearinS <br />frahlng. There is a 092216 non-structural metal stud framlng specificatlon, but it does not <br />referencethefremingofexterlorwall5. lsthereanymeblstudframinSonthisproied? <br />GWB specification includes meny differenttypes ofGWB, some whlch come at a much hlSher <br />priceperst. lcannotflndanywhereinthedrawlngsthatidentlfieswheretouleeachdifferent <br />type ofGWS. Some ofthe aoncerning GWg products includei <br />0929002.028-(68)5/8lTypeC-thisboardi5typi.allyusedinspeciflclJLassemblies. lamnot <br />saelng .ny fire rated GWB assemblie5 id these buildinSs. Al5o, note 5 on the Agsembly pege A009 <br />dlreds me to use a more standard 5/8" Type X GWB product. <br />092900 2.028.5 -(WRGB) USG FiberockAqua-Tou8h -This produddoes match the d€scription. <br />This i5 not a paper fac€d product, and therefore requires siSnitlcantwork to finish- <br />O929OO 2.028.5 (Pan 2) {FRX-G) - lmpact Resistant GWB -where is this located? <br />092900 2.02C- Coatad Tile backer boaad and underlayment_ UsG Fiberock Sackerboard-l wlll <br />quallry. GP Denshield Tilebacker. <br />O929OO 2.020 - Cem€nt gackea Board - thls 5hows 5/8" Wallboard, %" Floorin8 lnde.layment- <br />theydo not identlfya p.odud, and I would be excludlng flooring underlayment. <br />0929002.2€-LirtsGypsheathingasbelnginspecsectlon061000 Spe.OS1000doesnotshow <br />gyp sheathing, I would be excludlnS all €xterior sheathln8. <br />092900 2.2F -Abuse Resistant Panels (ARP) -where is this located? <br />092900 3-01.15 - Instrucb u5 to use WRGB in wet locations notscheduled to receive tite fintsh or <br />(ARP). <br />O929OO 3.01.16- lnstruats us to use Coated Fiber-faaed Gypsum Board ln areas scheduled to <br />No.4 for changes to Section 09 29 00. <br />Relerto structural for exteriorwall framlngatAdmin and Saalehouse {Wood <br />framed). Assembly lypes shown on page A009 that arekeyed to Admin, <br />Scalehousq MRW and T.asfer Euilding are shown to indicate 8€neral design <br />intent includinS Insutatlon and energycode requlrenents. All elemenb of <br />Mnw and Transfer bullding to be deslgned by PEMB MFR, ste€l stud franing <br />is not required. <br />Provide flat bar becking per E,3b, Othea backing ls provided as an option to <br />the contractor, <br />4 8lu2024
The URL can be used to link to this page
Your browser does not support the video tag.