Laserfiche WebLink
1.06 Bid ltem Schedule Section 00 00 04.L Replace Section 00 00 04.1 Bid <br />Schedule with the attached revised bid <br />schedule. Changed seeding to unit <br />price, and added landscaPe bid item <br />(lump sum). <br />Contractor must provide price for all <br />four (4) additive alternative bid items. <br />Contractor will be selected on lowest <br />responsive base bid. Depending on <br />base bid price and available funding, <br />the County may include additive <br />alternative bid items to the contract. <br />1".06.1 Revised Bid Proposal <br />Form <br />Section 00 00 04 Replace existing bid proposalform with <br />revised form. <br />t.o7 Measurement and <br />Payment Section <br />Section 00 43 01 Replace Measurement and PaYment <br />section in its entirety. Revised seeding <br />bid item to unit price and added <br />Landscape bid item No. 20. <br />1.08 CiviIAUTOCAD Files Civil AUTOCAD files are available upon <br />request. contact Danny Duong <br />(DDuong@scsengineers.com). <br />1.09 Section 010100 <br />Summary of Work <br />Section 01 0100 Section 010100 is added to Addendum <br />No. L. Construction of the compost <br />area lined leachate ponds shall not <br />start until July/August 2025. <br />1_.10 Section 0104 00 <br />Coordination with <br />Others <br />Section 01- 04 00 <br />Part L3.1 <br />Subsection I <br />Please add under Subsection H the <br />following statement: <br />CONTRACTOR shall use Trimble <br />ProjectSight for the construction <br />monogement software. OWNER will <br />provide and poy for a maximum of two <br />(2) licenses to the general contrqctor <br />for the duration of the <br />r.17 Lighting Substitution <br />Approval <br />The Lighting Substitution submittal is <br />approved and added to Addendum No <br />t. <br />I.I2.Revised Electrical <br />Drawings <br />Drawings E200, <br />E602, E503, E701 <br />The following changes and additions <br />are shown on the revised electrical <br />drawings. <br />Page 2 of 5