My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finalized Contract Agreement Packet
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
Finalized Contract Agreement Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 12:50:20 PM
Creation date
10/8/2024 12:48:44 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.06 Bid ltem Schedule Section 00 00 04.L Replace Section 00 00 04.1 Bid <br />Schedule with the attached revised bid <br />schedule. Changed seeding to unit <br />price, and added landscaPe bid item <br />(lump sum). <br />Contractor must provide price for all <br />four (4) additive alternative bid items. <br />Contractor will be selected on lowest <br />responsive base bid. Depending on <br />base bid price and available funding, <br />the County may include additive <br />alternative bid items to the contract. <br />1".06.1 Revised Bid Proposal <br />Form <br />Section 00 00 04 Replace existing bid proposalform with <br />revised form. <br />t.o7 Measurement and <br />Payment Section <br />Section 00 43 01 Replace Measurement and PaYment <br />section in its entirety. Revised seeding <br />bid item to unit price and added <br />Landscape bid item No. 20. <br />1.08 CiviIAUTOCAD Files Civil AUTOCAD files are available upon <br />request. contact Danny Duong <br />(DDuong@scsengineers.com). <br />1.09 Section 010100 <br />Summary of Work <br />Section 01 0100 Section 010100 is added to Addendum <br />No. L. Construction of the compost <br />area lined leachate ponds shall not <br />start until July/August 2025. <br />1_.10 Section 0104 00 <br />Coordination with <br />Others <br />Section 01- 04 00 <br />Part L3.1 <br />Subsection I <br />Please add under Subsection H the <br />following statement: <br />CONTRACTOR shall use Trimble <br />ProjectSight for the construction <br />monogement software. OWNER will <br />provide and poy for a maximum of two <br />(2) licenses to the general contrqctor <br />for the duration of the <br />r.17 Lighting Substitution <br />Approval <br />The Lighting Substitution submittal is <br />approved and added to Addendum No <br />t. <br />I.I2.Revised Electrical <br />Drawings <br />Drawings E200, <br />E602, E503, E701 <br />The following changes and additions <br />are shown on the revised electrical <br />drawings. <br />Page 2 of 5
The URL can be used to link to this page
Your browser does not support the video tag.