My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finalized Contract Agreement Packet
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
Finalized Contract Agreement Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 12:50:20 PM
Creation date
10/8/2024 12:48:44 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY - LOWER VALLEY TRANSFER STATION <br />ADDENDUM NO.1 <br />IULY L7,2O24 <br />The above-referenced Contract Documents shall be amended as indicated in detail below. One signed <br />copy of the Certification page shall be included with the bid. The inclusion of this Addendum will be <br />noted in the Agreement, and the execution of the Contract shall indicate full acceptance by all parties of <br />the provisions contained herein. Allother provisions of the Plans, Specifications, and other Contract <br />Documents not noted in the Addendum shall remain unchanged and in full effect. This Addendum shall <br />be attached to and become a part of the Plans and Specifications for the project. <br />Addendum <br />Item <br />Document Section, Page <br />Number, or Sheet <br />Description of Change <br />L.01 Response to RFI <br />Questions List <br />Response to RFI Questions List is added <br />to Addendum No. 1. <br />r.o2 Sample AIA Contract The sample AIA contract to be <br />executed between Kittitas County and <br />the selected contractor is added to <br />Addendum No.1. <br />1.03 AIA Bid Form - 310 The AIA Bid Form - 310 to be <br />completed and included with the <br />contractors bid is added to Addendum <br />No. 1. <br />1.04 Groundwater Elevation <br />Monitoring Data <br />Technical memorandum prePared bY <br />Jacobs regarding groundwater depth <br />measurements is added to Addendum <br />No. 1. <br />ln addition, the County measured <br />groundwater elevations daily at an <br />existing well identified as "PVC in Case, <br />N513270.58 , EL617507 .90, Elev 1548.8' <br />on Drawing C1 from June 28 to JulY 15, <br />2024. Groundwater depths ranged <br />from 37" to 39" below ground surface. <br />1.05 2019 Boring Logs 20i"9 boring logs are added to <br />Addendum No. L. <br />Page 1 of 5
The URL can be used to link to this page
Your browser does not support the video tag.