Laserfiche WebLink
1) Sheet 8603 & E701 -The <br />electrical panel PP-ASP is <br />changed from a 120/208V 3ph <br />panel to a277/48OY 3ph panel <br />as shown on the one-line and <br />in the schedules. <br />2l Sheet E701" - There is a minor <br />adjustment on the one-line for <br />the main switchboard - two <br />circuit breakers have been <br />updated to the correct size and <br />location. <br />3) Sheet E701 - The notes indicate <br />the irrigation pump enclosure <br />will require a stepdown <br />transformer and it is identified <br />as being supplied by the <br />irrigation pump ma nufacturer. <br />4l Drawing E200 was added to <br />identify the required conduit <br />and wiring for the aeration and <br />recirculation pump power and <br />controls. <br />T.L2,I Revised Civil Drawings Sheets C20,C24, <br />c27 <br />Revised drawings are added to <br />Addendum No. 1. <br />1.13 Revised Specification <br />Section 40 95 13 Control <br />Panels, VFDS, and RMC <br />Section 40 95 13 Revised specification is added to <br />Addendum No. 1. <br />1.r4 Water Recirculation <br />System Specification <br />Section 40 95 1,4 New specification is added to <br />Addendum No. 1 for Leachate Pond <br />water recirculation system. <br />1.15 Dewatering Section 0L 50 00 <br />Part 1.9, <br />Subsection B <br />Add following statement at the end of <br />the paragraph of Part L.9, subsection B <br />in Section 01 50 00: <br />lf dewotering is required, the <br />Contractor will be required to build <br />temporary sedimentation Ponds or <br />sedimentation trap BMPs which <br />discharge to the proiect storm system <br />in accordance with Stote of Woshington <br />- Deportment of Ecology - 2079 <br />Stormwote r Mo nage ment M a n uol for <br />Edstern Woshington, Chopter 7, <br />Element #10, Page 769. Alternotely, <br />BMPs con drain to o temporary grovity <br />or pumped conveyance system draining <br />Page 3 of 5