My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finalized Contract Agreement Packet
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
Finalized Contract Agreement Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 12:50:20 PM
Creation date
10/8/2024 12:48:44 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Iune 13,2023 <br />HWA Project No. 2022-1 88-2 I <br />4.12.7 Wet Weather Earthworks <br />5.0 CONDITIONS AND LIMITATIONS...,... <br />6.0 REFERENCES.. <br />Lrsr or Flcunns (For,lowtNc TEXT) <br />Site Vicinity Map <br />Site and Exploration Plan <br />Geologic Map <br />Soils Map <br />Unsuitable Soils Map <br />Figure B-1 <br />Figures B-2 &B-4 <br />Figure B-5 <br />Figures B-5 & 8-6 <br />Figures B-7 & B-8 <br />Figures B-9 & B-10 <br />4.1 l.3Pavement Structure Requirements ... <br />4.1 1.4HMA Design Considerations ........... <br />4. I 1.5 HMA Binder Selection.. <br />4. I 1.6 Pavement Construction..... <br />4.I L7 Differential Settlement of Roads ...... <br />4. I 2 GrNsneL EARTnwoRK CoNSIDERATIoNS <br />4.I2.I Subgrade Preparation for Foundations ..'....... <br />4.l2.2Structural Fill and Compaction ..........,.. "....'. <br />4.12.3 Ground Water Control..... <br />4.l2.4Temporary Slope Cuts.......... <br />4.12.5 Temporary Excavations................ <br />4.l2.6Erosion and Sediment Control <br />......t7 <br />......20 <br />','..,21 <br />)1 <br />......22 <br />.',.,.22 <br />......22 <br />......22 <br />......23 <br />......23 <br />......24 <br />......24 <br />......24 <br />......25 <br />......27 <br />Figure I <br />Figure 2 <br />Figure 3 <br />Figure 4 <br />Figure 5 <br />Appendices <br />Appendix A: HWA Exploration Soil Logs <br />Figure A-1 Legends of Terms and Symbols Used on Exploration Logs <br />Figures A-2 - A-9 Soil Test Boring Logs <br />Appendix B: Laboratory Test Results <br />Summary of Material Properties <br />Particle-Size Analysis Data Plots <br />Liquid Limit, Plastic Limit and Plasticity Index of Soils <br />Laboratory Compaction Characteristics of Soil <br />CBR (California Bearing Ratio) of Compacted Soils <br />One Dimensional Consolidation of Soils <br />Appendix C: Logs of Previous Explorations <br />Figures C-l through C-5 Soil borings Conducted by Jacobs (2020) <br />Figures C-6 through C-16 Test Pit Excavations Conducted by Jacobs (2019) <br />32022-188-21 KCTS - Final Geotechnical Report HWAGEOSCIENCES INC.
The URL can be used to link to this page
Your browser does not support the video tag.