My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finalized Contract Agreement Packet
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
Finalized Contract Agreement Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 12:50:20 PM
Creation date
10/8/2024 12:48:44 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br />1.0 INTRODUCTION <br />1.1 GpNsner.. <br />1.2 Pnorecr DnsczuprloN ......... <br />1.3 ScopB op SenvlcBs AND AuttoRtzRtloN............ <br />2.0 FIELD EXPLORATION AND LABORATORY TESTING.......... <br />2.1 Frcro ExproRRttoN .,.................. <br />2.2 LesoRAroRv TesrING ................ <br />2.3 ExrsrrNc GeorBcnNtcRr DRra.. <br />3.0 GENERAL SITE CONDITIONS............ <br />3.1 SrrBDrscruPrloN <br />GeNnRer Gporocv <br />SussuRracs CoNotrtoNs ........... <br />3.3.1 Soil Descriptions <br />3.4 GnornlnWerER <br />3.5 Sons........ <br />4.0 CONCLUSIONS AND RECOMMENDATIONS . <br />4.I GpNpRRr <br />4.2 Sersvttc DpstcN PenauernRs. <br />4.3 LrquerecrloN PoteNriRr <br />4.4 FotrNpATroNS <br />4.4.1 Bearing Capacity for Footings ..... <br />4.4.2 Laleral Resistance............. <br />4.4.3 Settlement <br />4.5 Froon Srnss <br />4.5.1 General.. <br />4.5.2 Settlement Considerations for Tipping Floor Slab <br />4.6 FoorrNc DRerNs <br />4.7 TneNsrpR SrRnoN RrrerNrNc Wens <br />4.7,1 Wall Foundations <br />4.7.2 Lateral Earth Pressures <br />4.7 .3 Wall Drainage............ <br />4.8 PpnunNrNt FIrr Sropss...... <br />4.9 Cotr,tposr Anre (NonrHwrsr Anre) <br />4.10UrLrrtes <br />4.10.1gedding and Pipe Support <br />4,l0.2Trench Backfill <br />4. 1 1 PevBIr,teNr CoNsroERATIoNS.. <br />4.lllsubgrade Preparation for Areas to be Paved <br />4. 1 1.2 Design Traffic Volume.... <br />Page <br />,..2 <br />...2 <br />..,2 <br />...3 <br />...J <br />...J <br />.,,4 <br />...5 <br />...5 <br />3.2 <br />J.J <br />5 <br />6 <br />6 <br />6 <br />..7 <br />.,7 <br />..7 <br />..7 <br />..8 <br />..9 <br />..9
The URL can be used to link to this page
Your browser does not support the video tag.