My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AIA 101 Agreement 08302024
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
AIA 101 Agreement 08302024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2024 9:02:50 AM
Creation date
9/3/2024 8:43:00 AM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Notes
Lower Valley TS Contract signed by contractor
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOWER VALLEY TRANSFER STATION <br />RESPONSE TO RFI QUESTIONS - August 1, 2024 <br />sE0m <br />t/ATERECWM <br />M <br />RHquEmm <br />RESPONSE <br />A revised bid schedule is Included in Addendum No. 44 for revising the 6' high <br />chain link fence quantity and gates. Shall include a top and bottom rail. <br />The bid schedule calls for 28501f of chain link fence and 10 gates. The plan page C3 only shows 4 <br />gates (2 - 20'wide double swing gates). The scale may be off, I'm getting a total of 3,9101f total of <br />The 6' high chain link fence w/ tan slats are for the perimeter site fencing and <br />the fence. Please clarify where the 6 missing gates are located and what kind of gates are <br />shall be galvanized. <br />7/26/2024 <br />71 <br />needed(single swings, double swings, roll gates, etc.) <br />Section 32 31 13 -Chain Link, fencing, and Gates is for fencing at the MAW <br />Regarding the specifications, they call for a black fence with can privacy slats. Plan page C3 calls <br />Building. <br />for a "6' high chain link fence w/tan slats per WSDOT standard plans. Please confirm if the fence is <br />galvanized or black. <br />Section 05 50 00 - Metal Fabrications address metal grating and wire mesh on <br />the south elevation of the Transfer Building. <br />The water and sewer systems shall be constructed in accordance with the City <br />7/29/2024 <br />72 <br />Are there any domestic requirements for materials ? <br />of Ellensburg Standard Specifications. The specifications do not mention <br />We cannot find in the specs if there Is . <br />domestic requirements for materials. <br />Street Lighting: Type IV similar to the MGLED 571W <br />Sheet E100 for location <br />Sheet E503 for the detail <br />Specs 26 56 2.03 (8) for pole details <br />Flood light at composite area: Similar to RSXF4 85,000 LM 646W <br />I am not able to find any information provided on what the exterior floodlights are supposed to be <br />Sheet E100 for location <br />mounting to? Can you please confirm? <br />Mounting Height 40' <br />Specs 26 56 2,03 (8) for pole details <br />-- <br />J/25/2024 <br />73 <br />-Mounting height <br />Flood light on the exterior of MRW and the transfer buildings <br />- Pole type {square, round, etc.} <br />Similar to RSXF4 85,000 LM 646W <br />Color <br />Wall mounted by wall bracket <br />-Size <br />28' AFFL at the transfer building <br />26' AFFK at the MRW building <br />First and foremost, the spec is calling out a voice/evac system. This is something that is not <br />required for this occupancy type and is very costly. Is this being mandated? <br />Also, two of the bldgs (scale and Admin) don't even require a fire alarm system as well. I'm all for <br />going above and beyond what's needed but wanted to make sure. Maybe on those two bldgs we <br />The Hazardous area is within the MRW building where this general note lives. <br />could put in remote annunciators to save money. Just a thought if FA is not needed. <br />Refer to sheet 0 A001 (Scope of work, paragraph (2)). <br />There are also things called out in the spec that are not on the drawings, c, elevator shutdowns, <br />The fire alarm notifies the people to evacuate. The voice notification is not <br />chute Interlocks, kitchen hoods, generator heat, duct smokes, etc. I also don't see anything for <br />required. <br />doors and there's a whole section (E) dedicated to that on the spec. <br />-- <br />7/29/2024 <br />74 <br />All buildings shall have fire alarm system. <br />If the spec calls for something that is not there should I just ignore it? <br />Exclude from 2446 00 2.03 the system interfaces that do not exist: <br />Also, is this within city limits? The city requires exterior strobes on the address side of each <br />Items (A) (7 & 8) <br />building that has a new fire alarm panel and everything to be keyed as cat30, <br />Items (8) (2, 3, 4, & 5) <br />Items (C) and (E) <br />The General Notes on 4_E101 says "All electrical raceways, equipment, and devices to be rated for <br />installation in explosion hazardous areas" but the drawing doesn't actually show which area is an <br />explosion hazard. Does the whole site need to ran in conduit? That wasn't called out either on if <br />so, whether it's EMT or Rigid. <br />1. Yes, recycling area is paved with asphalt. The contractor shall put zero for <br />1. Addendum 3 clarified that the Recycling Area is paved with asphalt, but Bid Item 39 for the area <br />Bid Item #39. <br />calls for a'Concrete Pad'. What is included in this bid item? <br />2. One steel ramp is required on the east and west end of the Recycling drop- <br />-- <br />7(29)2024 <br />IS <br />2. Bid Item 40 in the Recycling Area calls for 'Steel Ramps'. Is there a detail or plan for the ramps? <br />off area. Steel ramp details are shown on sheet C-19. Contractor shall provide <br />a price to install two steel ramps for Bid Item Jl40. <br />3. Sheet C19 has details for an aluminum ADA ramp system. We could not find a call out for this <br />ramp, but have assumed that it was meant to be ADA access for the modular building? <br />3. These ramps are for the Recycling drop-off area. <br />In Specification 10 14 00, <br />The building numbers in the specs and the plans do not match, the listing for signs in the specs do <br />-- <br />7/28/2024 <br />76 <br />not correlate to anything that is on the plans like room number, room use, etc. <br />Delete paragraphs-3.028, C, D, E.1, E7 -11 <br />Add paragraph 3.02 A.g: Quantity: 4 <br />Looking through addendum 2 for the HMA it references .75M ESAL PG 64H-28 with payment by <br />-- <br />7/29/2024 <br />77 <br />the ton and the addendum 2 bid sheet references the HMA by the square yard. Is the square yard <br />Payment will be made by the square yard. <br />still the correct unit of measure? <br />-- <br />7/30/2024 <br />78 <br />For sheet E701, the note N1 for generator and transfer switch indicates "Optional if needed." <br />There is no transfer switch or generator required for bidding purposes. <br />There is no specification on the generator. <br />8/1/2024 <br />