My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AIA 101 Agreement 08302024
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
AIA 101 Agreement 08302024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2024 9:02:50 AM
Creation date
9/3/2024 8:43:00 AM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Notes
Lower Valley TS Contract signed by contractor
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOWER VALLEY TRANSFER STATION <br />RESPONSE TO RFI QUESTIONS - August 1, 2024 <br />sEcrwx <br />DATE RECIMO <br />ff <br />Will QUIESTM <br />FISPON" <br />The GWB products that I would expect to use on a project like this would include: <br />Georgia Pacific 5/8" Type X GW8 at all locations other than what I list below. <br />Georgia Pacific 5/8" Tilebacker — at all locations scheduled to receive wall tile, (Shown in <br />restrooms only to S' AFF.) <br />Georgia Pacific 5/8" Mold Guard paper faced GWB— in wet areas as defined in 0929DO 1.03A. <br />Abuse and/or Impact Resistant GWB—This would only be at specified areas, of which I cannot <br />find. This seems like an unusual product for this type of project, and I would prefer t0 exclude this <br />product unless we can determine where it is needed. <br />Fiberglass Faced GWB such as Georgia Pacific Dens Armour/USG Fiberock Aqua Tough — this <br />would typically be called out in extremely wet areas, or areas where we would be hanging GWB <br />prior to the building being dried in. Or perhaps a high humidity area such as an indoor pool. 1 <br />would prefer to exclude this product unless we can determine where it is needed. <br />092900 3.010.2.a — Calls for Level 5 at all surfaces exposed to view that are to receive paint. <br />Seems expensive and strange given the type of buildings these are, but I will figure a level 5 finish, <br />unless you direct me otherwise. <br />095100—The finish schedules identify ACT-1 at all locations scheduled to receive ACT. The <br />095100 specification identifies 3 different types of ACT. Where do we identify which tile is ACTQ? <br />Is it correct that there is only 1 type of ACT on this project? <br />095100 & 095300 — It may be too late, but we would be able to offer a significant savings on the <br />ACT package if Certainteed ACT comparable products would be acceptable. (If you can confirm <br />the desired ACT product, we can offer a VE deduct if there is a Certainteed comparable tile and <br />grid product if that works for you.) <br />On plan page C8 there is a note saying that there needs to be Thermoplastic Stop Bars at all STOP <br />-- <br />7/25/2024 <br />67 <br />signs. Where are we suppose to put these in the bid tab? There is only Double Yellow and Single <br />This item can be added to Bid Base Item #15 - Site Signage. <br />white striping bid items. <br />Insulation is required per Wall Sections 6/AS_A501, 7/Al_A501, 2/A4 A501, <br />and 3/A4 A501. Structural steel paint requirements added to Addendum No. <br />4. <br />Add the following to Section 09 96 002.01 B ACCEPTABLE MANUFACTURERS <br />Basis of Design: Supply Sherwin-Williams Company products Indicated or <br />comparable products from those listed below: <br />Steel Substrates: Pigmented Polyurethane over Epoxy System <br />1. Prime Coat: Epoxy, high -build, low gloss: <br />1st Coat: S-W Macropoxy 646-100 Fast Cure Epoxy, B58 Series 17.043.5 <br />mils wet, 5.0-10.0 mils dry per coat. <br />2. Intermediate Coat: S-W Hi -Solids Polyurethane Semi -Gloss, 865-350 Series. <br />3. Topcoat: Polyurethane, two -component, pigmented, gloss: <br />5-W Hi -Solids Polyurethane Semi -Gloss, B65-350 Series. (4.5-8.0 mils wet, <br />3.0-5.0 mils dry per coat. <br />4. Epoxy Primer: 1st Coat: <br />a. If the metal does not have a zinc rich primer already applied, use the <br />1. Is insulation required on the transfer station and the MRW building? If so what is required and <br />following as a first step: <br />where is it located? (See recommendations below) <br />b. 5-W Corothane I GalvaPac 2K Zinc -Rich Primer B65G70 (3.0-4.0 mils dry) <br />-- <br />7/25/2024 <br />68 <br />Metal: <br />2. What paint specifically is required for all structural steel located at the Transfer Station and <br />5. Miscellaneous, ferrous Metal, Railings <br />MRW Buildings? <br />a. Waterbased: Semi -Gloss Finish: 1st Coat: S-W Pro Industrial Pro -Cry[ <br />Universal Primer, B66-1310 Series (5.0 mils wet, 2.0 mils dry) <br />2nd Coat: S-W Pro Industrial Waterbased Alkyd Urethane Enamel Semi - <br />Gloss, B53-1150 Series. <br />3rd Coat: S-W Pro Industrial Waterbased Alkyd Urethane Enamel Semi - <br />Gloss, BS3-1150 Series (4.0-5.0 mils wet, 1.4 1.7 mils dry per coat) <br />6. Manufacturers: Subject to compliance with requirements, provide products <br />by one of the following: <br />International Protective Coatings; AkzoNobel. <br />PPG Paints; PPG Industries, Inc. <br />Rust-Oleum Corporation; a subsidiary of RPM International, Inc. <br />Sherwin-Williams Company (The). <br />Tnemec Company, Inc. <br />RFI spreadsheet - No. 35 response addresses unsuitable soil payment: <br />The contractor shall perform a topographic survey for each unsuitable soil <br />-- <br />7(25{2024 <br />69 <br />Will the sloping or shoring area necessary for the deep excavations be included in the surveyed <br />removal area prior to starting excavation. Once the excavation is complete, <br />calculation for payment? That soil removed for sloping paid as unsuitable soils? <br />the contractor will perform a final topographic survey and will be paid based <br />on the soil removed and topographic surveys. Common fill will be calculated <br />usingthe same methodolo <br />Just curious if the structured cabling (voice/data/fiber) is being provided by owner? I have an <br />electrical contractor who is requesting a bid an that portion of the work and I don't see any <br />-- <br />7/26/2024 <br />70 <br />specifications (Div. 27000). Please let me know as soon as possible beings the bid is due on the <br />Yes, cabling will be provided by Owner. <br />30th. If the owner is providing this work could you please forward my information to them, <br />thanks. <br />8/1/2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.