My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AIA 101 Agreement 08302024
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
AIA 101 Agreement 08302024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2024 9:02:50 AM
Creation date
9/3/2024 8:43:00 AM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Notes
Lower Valley TS Contract signed by contractor
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOWER VALLEY TRANSFER STATION <br />RESPONSE TO RFI QUESTIONS - August 1, 2024 <br />SECTION <br />GATE RECTO <br />a <br />An QUESTION <br />RESPONSE <br />Sales Building(PP-sales): <br />The Sales Building isn't marked with Construction Note 3 for future expansion. Additionally, there <br />The feeder callout 109 is part of the future expansion, which is not part of this <br />Sheet E100 <br />7/22/2024 <br />58 <br />is a feeder callout 109 for this circuit, but there is no tag 109 on the site plans. Could we please <br />contract. <br />clarify whether this conduit needs to be run somewhere on the site plans E100? <br />Clarification on Feeder 106 on E602: <br />(20) 500 MCM AL Conductors in (2) 6" conduits. (12) $00 MCM in (1) 6" and <br />Sheet E602 <br />7/22/2024 <br />59 <br />Could we please get clarification on callout feeder 106 on E602? Do they want 7 — 6" conduits <br />(8) SOOMCM in a (1) 6" conduit. (NOTE: the contractor can provide other <br />with 3600 kcmli? <br />combinations of wire and cabling as long as it satisfies the NEC.) <br />Fire Pump Conduit Size: <br />Electric Fire Pump is future and there are no conduits/wires. The Main <br />Sheet E701 <br />7/22/2024 <br />60 <br />What size conduit is required for the fire pump? Construction Note 2 on plan E701. mentions <br />Switchboard shall be equipped with connection lugs to accommodate the <br />underground conduits, and we assume it is 6" based on other 6" underground conduits. Could <br />future Electric Fire Pump. <br />you please confirm? <br />On plan sheet C3, the 4" thick pavement hatching is shown going through the recycling center. See <br />the red clouded area in the snip below. Please confirm this area will receive asphalt pavement. <br />Sheet C3 <br />7J22/2024 <br />61 <br />Yes, asphalt paving is required in the recycling center. <br />Also on plan sheet C3, the 4" thick pavement hatching is shown going through the MRW building. <br />No asphalt paving required within the MRW building. This area In the MRW <br />Sheet C3 <br />7/22/2024 <br />62 <br />See the green clouded area in the snip below. However, in the structural plans, the MRW building <br />building will be constructed of a concrete slab. <br />is shown with a slab floor. Please confirm whether this area will receive asphalt pavement. <br />Explosion proof heat detection works as well and should be part of the Fire <br />Also the MRW building has a note about being explosion proof at least out in the main area. If so, <br />Specialists design based on the performance specifications. <br />you would most likely not want smoke and heat detection on the ceiling as smokes that are <br />Since this is a performance specification, code minimum will work for horn <br />-- <br />7/22/2024 <br />43 <br />explosion proof are 4k each my cost, heat detectors are not as bad as they run around 300 each. <br />strobes. <br />Also, they show a huge number of horn strobes in there, more than needed and those are very <br />The quantities and location of the fire alarm equipment are an estimate in the <br />expensive as well. 1 just need to know if we can do code minimum or if All those devices are <br />design and are dependent upon the Washington State Certified Alarm <br />actually explosion proof. I left another message today with your firm. <br />Specialist that will detail the entire system during construction. <br />Sheet C9 Detail A/C9 shows a road section with curb & gutter on both sides. Note below says <br />The only location on the project where curb and gutter is required (Detail A on <br />'transfer building north entrance and exit'. The plan sheets for this area do not appear to show a <br />C-9) is along the sloped access road leading into the transfer building. Curb <br />Sheet C9 <br />7/24/2024 <br />64 <br />curb or have call out to this detail. Can you clarify where, if any, concrete curb and gutter would <br />and gutter will be required on both sides of the transfer building access road <br />be located? <br />starting at the entrance to the transfer building north for 2351f (4701f total). <br />Spec Section 10 81 12- Bird Control Devices- <br />10 81 12 <br />7/24/2024 <br />65 <br />Spec Section 10 81 12- Bird Control Devices- What are the locations and limits for the bird netting? <br />Delete paragraphs 1.3 Bird Netting, 2.01C Bird Netting, and 2.03 Bird Netting <br />Hardware <br />See Addendum No. 4 for changes to Section 09 29 00. <br />Structural drawings show wood framing. Architectural shows a mix of steel stud and wood <br />framing, but the wall types page A009 shows all steel stud framing. Further, there is no 054000- <br />specification section, which is typically where we would see the exterior wall or load bearing <br />framing. There is a 092216 non-structural metal stud framing specification, but it does not <br />Refer to structural for exterior wall framing at Admin and Scalehouse (Wood <br />reference the framing of exterior walls. Is there any metal stud framing on this project? <br />framed). Assembly types shown on page A009 that are keyed to Admin, <br />Scalehouse, MAW and Trasfer Building are shown to indicate general design <br />GWB specification includes many different types of GWB, some which come at a much higher <br />intent including insulation and energy code requirements. All elements of <br />price per SF. I cannot find anywhere in the drawings that identifies where to use each different <br />MRW and Transfer building to be designed by PEMS MFR, steel stud framing <br />type of GWB. Some of the concerning GWB products include: <br />is not required. <br />092900 2.028— (GB) 5/8" Type C —this board is typically used in specific UL assemblies. I am not <br />Provide flat bar backing per E.3b, Other backing is provided as an option to <br />seeing any fire rated GWB assemblies in these buildings. Also, note 5 on the Assembly page A009 <br />the contractor. <br />directs me to use a more standard 5/8" Type X GWB product. <br />0929002.02B,S—(WRG13) USG Fiberock Aqua -Tough — This product does match the description. <br />This is not a paper faced product, and therefore requires significant work to finish. <br />092900 2.028.5 (Part 2) jFRX-G) — Impact Resistant G W8 — where is this located? <br />092900 2.02C— Coated Tile backer board and underlayment — USG Fiberock eackerboard— I will <br />qualify a GP Denshield Tilebacker. <br />092900 2.02D —Cement Backer Board —this shows 5/8" Wallboard, W Flooring underlayment — <br />'.. <br />they do not identify a product, and I would be excluding flooring underlayment. <br />092900 2.2E— Lists Gyp sheathing as being in spec section 061000. Spec 061000 does not show <br />gyp sheathing. 1 would be excluding all exterior sheathing. <br />092900 2.2 F — Abuse Resistant Panels (ARP) — where is this located? <br />092900 3.01AS — Instructs us to use WRGB in wet locations not scheduled to receive the finish or <br />(ARP). <br />092900 3.01.16 — Instructs us to use Coated Fiber -faced Gypsum Board in areas scheduled to <br />�ncr�mn <br />cc <br />mewve tile. finish. <br />8/1/2024 <br />