My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-07-22-minutes-public-works-&-cds-study-session
>
Meetings
>
2024
>
08. August
>
2024-08-06 10:00 AM - Commissioners' Agenda
>
2024-07-22-minutes-public-works-&-cds-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 1:31:29 PM
Creation date
8/1/2024 1:14:45 PM
Metadata
Fields
Template:
Meeting
Date
8/6/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
120774
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LIST OF FIGURES <br />Figure1-1 <br />Project Study Area............................................................................................................................................2 <br />Figure 1-2 <br />Feasibility Study Process and Approach....................................................................................................6 <br />Figure2-1 <br />Range of Alternatives......................................................................................................................................9 <br />Figure 2-2 <br />No Build Conditions (Alternative 6)...........................................................................................................10 <br />Figure 2-3 <br />Alternatives 1, 2, and 3 - General Alignment............................................................................................12 <br />Figure 2-4 <br />Alternative 1 - Proposed Configuration....................................................................................................13 <br />Figure 2-5 <br />Alternative 2 - Proposed Configuration...................................................................................................15 <br />Figure 2-6 <br />Alternative 3 - Proposed Configuration...................................................................................................18 <br />Figure 2-7 <br />Alternative 4A - Conceptual Cross-Section.............................................................................................19 <br />Figure 2-8 <br />Alternative 4A - General Alignment...........................................................................................................20 <br />Figure 2-9 <br />Alternative 4B - Conceptual Cross-Section............................................................................................. <br />21 <br />Figure 2-10 <br />Alternative 4B - General Alignment...........................................................................................................22 <br />Figure 2-11 <br />Alternative 5 - Conceptual Cross-Section................................................................................................23 <br />Figure 2-12 <br />Alternative 5 - General Alignment.............................................................................................................24 <br />Figure 3-1 <br />Monday Summer Westbound Average Vehicle Volumes on 1-90 in the Study Area, 2018............35 <br />Figure 3-2 <br />Future Year 2040 No Build Modeled Travel Speeds by Time of Day and Location <br />along 1-90 in the Study Area on Memorial Day Monday.......................................................................36 <br />Figure 3-3 <br />Cultural and Historic Sites, Parks, and Recreational Facilities in the Study Area ........................ <br />47 <br />Figure 3-4 <br />Environmental Health Disparities Map of 1-90 Corridor Study Area..................................................51 <br />Figure 4-1 <br />Tier 1 Evaluation Summary by Alternative - Weighted Score.............................................................62 <br />Figure 4-2 <br />Tier 2 Evaluation Summary by Alternative - Weighted Score.............................................................70 <br />Figure 5-1 <br />Public Survey 1 Results Summary - Biggest Public Concerns............................................................75 <br />Figure 5-2 <br />Public Survey 1 Results Summary - Prioritization of Improvements...............................................76 <br />Figure 5-3 <br />Public Survey 2 Results Summary - Preferred Alternative.................................................................76 <br />Figure 5-4 <br />Webinar 2, February 2024 - Sample Potting Question..........................................................................80 <br />VOLUME 1: FEASIBILITY REPORT 1-90 Corridor — Easton to Cle Elum Feasibility Study I vii <br />
The URL can be used to link to this page
Your browser does not support the video tag.