My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-07-22-minutes-public-works-&-cds-study-session
>
Meetings
>
2024
>
08. August
>
2024-08-06 10:00 AM - Commissioners' Agenda
>
2024-07-22-minutes-public-works-&-cds-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 1:31:29 PM
Creation date
8/1/2024 1:14:45 PM
Metadata
Fields
Template:
Meeting
Date
8/6/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
120774
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LIST OF TABLES <br />Table1-1 <br />WSDOT M2 and M3 Teams.................................................................................................................................5 <br />Table 1-2 <br />Feasibility Study Process and Approach.......................................................................................................7 <br />Table 3-1 <br />Collision Types along 1-90 in the Study Area, 2018 through 2023........................................................29 <br />Table 3-2 <br />Collisions by Injury Severity along 1-90 in the Study Area, 2018 through 2023................................29 <br />Table 3-3 <br />Injury Severity by Collision Type along 1-90 in the Study Area, 2018 through 2023........................30 <br />Table 3-4 <br />Injury Severity by Time of Year along 1-90 in the Study Area, 2018 through 2023 ............................30 <br />Table 3-5 <br />Injury Severity by Road Conditions along 1-90 in the Study Area, 2018 through 2023......................31 <br />Table 3-7 <br />ESA Listed Species Potential Presence and Designated Critical Habitat Adjacent to <br />EachAlternative................................................................................................................................................44 <br />Table 3-8 <br />Select Socioeconomic Indicators.................................................................................................................49 <br />Table 3-9 <br />Environmental Health Disparities Summary for the 1-90 Corridor Study Area................................50 <br />Table 4-1 <br />Tier 1: Initial and Revised Evaluation - Project Goals, Criteria, Performance <br />Measurements, and Weight...........................................................................................................................54 <br />Table 4-2 <br />Tier 1 Evaluation Results - Non-Weighted.................................................................................................58 <br />Table 4-3 <br />Tier 1 Evaluation - Weighted Scores............................................................................................................ <br />61 <br />Table 4-4 <br />Tier 2: Targeted Evaluation - Additional Criteria and Rating Descriptions.......................................64 <br />Table 4-5 <br />Tier 2 Evaluation Results - Non-Weighted.................................................................................................66 <br />Table 4-6 <br />Tier 2 Evaluation - 1-90 Alternatives Weighted Scores...........................................................................69 <br />Table 5-1 <br />Stakeholders Contacted and Interviewed.................................................................................................74 <br />Table 5-2 <br />Public Survey 1, Summer 2023 - Survey Questions................................................................................. <br />75 <br />Table 5-3 <br />Public Survey 2, February 2024 - Survey Results......................................................................................77 <br />Table 5-4 <br />Webinar 1, August 2023 - Questions and Answers..................................................................................79 <br />VOLUME 1: FEASIBILITY REPORT 1-90 Corridor - Easton to Cle Elum Feasibility Study I viii <br />
The URL can be used to link to this page
Your browser does not support the video tag.