Laserfiche WebLink
LIST OF TABLES <br />Table1-1 <br />WSDOT M2 and M3 Teams.................................................................................................................................5 <br />Table 1-2 <br />Feasibility Study Process and Approach.......................................................................................................7 <br />Table 3-1 <br />Collision Types along 1-90 in the Study Area, 2018 through 2023........................................................29 <br />Table 3-2 <br />Collisions by Injury Severity along 1-90 in the Study Area, 2018 through 2023................................29 <br />Table 3-3 <br />Injury Severity by Collision Type along 1-90 in the Study Area, 2018 through 2023........................30 <br />Table 3-4 <br />Injury Severity by Time of Year along 1-90 in the Study Area, 2018 through 2023 ............................30 <br />Table 3-5 <br />Injury Severity by Road Conditions along 1-90 in the Study Area, 2018 through 2023......................31 <br />Table 3-7 <br />ESA Listed Species Potential Presence and Designated Critical Habitat Adjacent to <br />EachAlternative................................................................................................................................................44 <br />Table 3-8 <br />Select Socioeconomic Indicators.................................................................................................................49 <br />Table 3-9 <br />Environmental Health Disparities Summary for the 1-90 Corridor Study Area................................50 <br />Table 4-1 <br />Tier 1: Initial and Revised Evaluation - Project Goals, Criteria, Performance <br />Measurements, and Weight...........................................................................................................................54 <br />Table 4-2 <br />Tier 1 Evaluation Results - Non-Weighted.................................................................................................58 <br />Table 4-3 <br />Tier 1 Evaluation - Weighted Scores............................................................................................................ <br />61 <br />Table 4-4 <br />Tier 2: Targeted Evaluation - Additional Criteria and Rating Descriptions.......................................64 <br />Table 4-5 <br />Tier 2 Evaluation Results - Non-Weighted.................................................................................................66 <br />Table 4-6 <br />Tier 2 Evaluation - 1-90 Alternatives Weighted Scores...........................................................................69 <br />Table 5-1 <br />Stakeholders Contacted and Interviewed.................................................................................................74 <br />Table 5-2 <br />Public Survey 1, Summer 2023 - Survey Questions................................................................................. <br />75 <br />Table 5-3 <br />Public Survey 2, February 2024 - Survey Results......................................................................................77 <br />Table 5-4 <br />Webinar 1, August 2023 - Questions and Answers..................................................................................79 <br />VOLUME 1: FEASIBILITY REPORT 1-90 Corridor - Easton to Cle Elum Feasibility Study I viii <br />