Laserfiche WebLink
LIST OF APPENDICES <br />The appendices listed below can be found in the 1-90 Corridor - Easton to Cie Elum Feasibility <br />Study, Volume II: Appendices. <br />Appendix A <br />Traffic Modeling Reports - 2019 and 2024 <br />Appendix B <br />Environmental Maps - 2024 <br />Appendix C <br />Cultural Resources Review-2024 <br />Appendix D <br />FHWA Screening Tool for Equity Analysis of Projects (STEAP) Data <br />Appendix E <br />EJ Screen Results <br />Appendix F <br />Detailed Evaluation Worksheets for Each Alternative <br />Appendix G <br />In-depth Environmental Evaluation by Alternative <br />Appendix H <br />Detailed Evaluation Worksheets for the 1-90 Alternatives <br />Appendix I <br />Public Survey Results - Summer 2023 <br />Appendix J <br />Public Survey Results - February 2024 <br />Appendix K <br />Webinar Polling Results - February 2024 <br />VOLUME I: FEASIBILITY REPORT 1-90 Corridor - Easton to Cle Elunn Feasibility Study I vi <br />