My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-07-22-minutes-public-works-&-cds-study-session
>
Meetings
>
2024
>
08. August
>
2024-08-06 10:00 AM - Commissioners' Agenda
>
2024-07-22-minutes-public-works-&-cds-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 1:31:29 PM
Creation date
8/1/2024 1:14:45 PM
Metadata
Fields
Template:
Meeting
Date
8/6/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
120774
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br />4 ALTERNATIVES EVALUATION CRITERIA.....................................................52 <br />4.1 Evaluation Criteria............................................................................................................................................52 <br />4.2 Tier 1 Evaluation Approach and Results.....................................................................................................57 <br />4.3 Tier 2: Targeted Evaluation.............................................................................................................................63 <br />4.4 Alternatives Selected to Move Forward.....................................................................................................65 <br />5 COMMUNITY AND STAKEHOLDER INVOLVEMENT................................71 <br />5.1 Public Outreach Plan.......................................................................................................................................72 <br />5.2 STEER 1-90 Coalition.........................................................................................................................................72 <br />5.3 Tribal Coordination.......................................................................................................................................... 73 <br />5.4 Public and Stakeholder Engagement..........................................................................................................73 <br />6 NEXT STEPS............................................................................................................ 82 <br />6.1 Legislative Outreach and Funding...............................................................................................................82 <br />6.2 Preliminary Engineering.................................................................................................................................83 <br />6.3 Environmental Analysis and Documentation............................................................................................84 <br />6.4 Outreach and Engagement.............................................................................................................................84 <br />6.5 NEPA Preferred Alternative, Final Design, and Implementation..........................................................85 <br />6.6 Other Opportunities for 1-90 in the Study Area.......................................................................................85 <br />6.7 Immediate Next Steps.....................................................................................................................................86 <br />REFERENCES..................................................................................................................87 <br />VOLUME I: FEASIBILITY REPORT 1-90 Corridor Easton to Cle Elum Feasibility Study I v <br />
The URL can be used to link to this page
Your browser does not support the video tag.