Laserfiche WebLink
CHAPTER 4: ALTERNATIVES EVALUATION CRITERIA <br />Figure 4-2 Tier 2 Evaluation Summary by Alternative -Weighted Score <br />70.0 <br />60.0 <br />50.0 <br />40.0 <br />30.0 <br />20.0 <br />10.0 <br />■ Relative Cost of Alternatives <br />s Equity/Inclusion <br />■ Resiliency <br />■ Environmental <br />■ Freight Mobility <br />III Safety <br />m Transportation Demand <br />Alt 1 <br />3.3 <br />6.7 <br />9.0 <br />6.0 <br />6.7 <br />20.0 <br />8.6 <br />Alt 2 <br />3.3 <br />8.3 <br />7.5 <br />6.0 <br />6.7 <br />20.0 <br />8.6 <br />[" 22.5 1 <br />Alt 3 <br />0.0 <br />8.3 <br />75 <br />6.0 <br />6.7 <br />22.5 <br />7.9 <br />VOLUME I: FEASIBILITY REPORT 1-90 Corridor Easton to Cle Elum Feasibility Study 1 70 <br />