My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7-22-2024_PW_CDS SS Briefings
>
Meetings
>
2024
>
07. July
>
2024-07-22 1:30 PM - Public Works & CDS Study Session
>
7-22-2024_PW_CDS SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 11:25:31 AM
Creation date
7/18/2024 11:11:48 AM
Metadata
Fields
Template:
Meeting
Date
7/22/2024
Meeting title
Public Works & CDS Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER l: INTRODUCTION <br /> volumes are approximately four times higher 1,000 vehicles per hour. On Memorial Day,the <br /> on 1-90 and three times higher on county hourly volumes exceeded 2,500 vehicles per <br /> roads than typical days. Speeds drop from an hour for 12 hours and the total daily demand is <br /> average of 70 miles per hour(mph)to 15 mph almost three times higher. <br /> on 1-90, and increase by approximately 5 mph Although this 2019 study focused on traffic <br /> on county roads, reflecting that non-local between MP 70 and MP 93, the modeling <br /> travelers tend to speed along the local roads results indicated major congestion resulted <br /> as they avoid 1-90 congestion. On those specific <br /> from traffic entering at MP 80. Therefore, <br /> Mondays, congestion lasts for 12 hours on this feasibility study addresses these traffic <br /> 1-90, while diversion and increased speed lasts challenges by developing and analyzing <br /> approximately 6 hours on the county roads. potential alternative solutions between MP 70 <br /> The study also found the average travel speed and MP 85. <br /> along 1-90 within the study area, at 1:00 pm <br /> on Memorial Day 2018, was less than 20 mph. <br /> Based on the historical speed data,there is 1.3 Study Partners <br /> congestion along the corridor between 10:00 In conducting this study,the County's priority <br /> am and 9:00 pm.Travel speeds increased past was to coordinate with a broad range of groups <br /> MP 70 (traveling westbound)where the freeway who utilize or operate the transportation <br /> widens from two to three lanes. network within the study area.A key element <br /> Compared with typical volumes on I-90 (mid- of this effort included partnering with WSDOT <br /> week during the fall and spring months),the to confirm proposed alternatives align with <br /> volumes on summer and holiday weekends the State's goals and plans. Since I-90 is a <br /> were significantly higher. On an average federal(Federal Highway Administration, <br /> weekday,the hourly volume never exceeded FHWA)facility operated by WSDOT, it is <br /> •- <br /> } - <br /> VOLUME I: FEASIBILITY REPORT 1-90 Corridor Easton to Cle Elum Feasibility Study 1 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.