My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7-22-2024_PW_CDS SS Briefings
>
Meetings
>
2024
>
07. July
>
2024-07-22 1:30 PM - Public Works & CDS Study Session
>
7-22-2024_PW_CDS SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 11:25:31 AM
Creation date
7/18/2024 11:11:48 AM
Metadata
Fields
Template:
Meeting
Date
7/22/2024
Meeting title
Public Works & CDS Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER l: INTRODUCTION <br /> hand are developed. Feasibility studies are Need for the Project <br /> then conducted to analyze these alternatives The project is needed to ensure continued <br /> based on a variety of factors including safety and mobility throughout the study area. <br /> transportation and mobility, environment, Kittitas County is home to many key freight- <br /> equity, resiliency, government and local agency generating and time-sensitive industries, <br /> coordination, and public input. Although such including agriculture and forestry, with 1-90 <br /> an analysis is not as detailed as a design serving as a key thoroughfare for these <br /> or environmental study, it is intended to industries. Providing a transportation system <br /> provide enough information to allow project that accommodates these key economic <br /> sponsors to make decisions by reducing generators and the timely movement of goods <br /> the quantity and scope of alternatives.The is important to Kittitas County. As such, <br /> findings of the feasibility study will guide a WSDOT has identified this corridor as one of <br /> shift towards a more focused allocation of the state's major truck corridors, which is a <br /> resources,facilitating effective investment major economic driver in the region,through <br /> in the subsequent stages of design and both customers to the businesses along the <br /> environmental assessment. routes and providers of goods movement for <br /> producers and growers in the County. <br /> Project Purpose and Need <br /> In addition, growth within the County— <br /> This feasibility study is designed to identify industrial and residential— is contributing to <br /> potential solutions which can fulfill the increased congestion along 1-90. Such growth <br /> project's purpose and goals, and why the is putting a strain on the roadway network, <br /> project is needed. both in terms of traffic congestion and wear <br /> Project Purpose and Goals and tear. Most of the congestion in Kittitas <br /> County occurs at certain times of the year— <br /> The purpose of the project is to: near ski resorts in winter or routes accessing <br /> • Ensure continued and improved safety to the lakes in the summer. Heavy seasonal <br /> 1-90 users, including travelers, maintenance congestion on 1-90 and state routes within the <br /> crews,freight operators, and emergency study area can lead to traffic diverting onto <br /> responders. local county roads.This poses both safety risks <br /> • Enhance mobility and connectivity on 1-90 and delays to residents and also increases <br /> for passenger vehicles,freight,transit, the maintenance burden on the County.This <br /> and active modes and provide support for feasibility study addresses potential solutions <br /> increased person and freight throughput. to such traffic growth and congestion. <br /> • Respect the surrounding environment A study initiated by the County in 2019 (see <br /> and provide measures to address the Appendix A)found congestion along 1-90 is <br /> resiliency of the system, improve wildlife heaviest during summer weekends and major <br /> connectivity, and reduce impacts to holidays (Memorial Day,4th of July, and Labor <br /> environmental baseline conditions. Day). In the westbound direction,this regularly <br /> • Support equity by ensuring communities occurs between MP 70 and MP 93 on Sundays <br /> and individuals are not disproportionately in summer, with the most extreme congestion <br /> impacted. occurring on the Mondays of Memorial Day and <br /> Labor Day holiday weekends. Holiday traffic <br /> VOLUME 1: FEASIBILITY REPORT 1-90 Corridor Easton to Cle Elum Feasibility Study 1 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.