Laserfiche WebLink
l <br />f JUB <br />J-U•B ENGINEERS, INC. <br />J-U-B ENGINEERS, Inc. <br />AGREEMENT FOR PROFESSIONAL SERVICES <br />Attachment 1A — Detailed Scope of Work <br />PROJECT NAME: 2023 — East Taxilane Pavement Rehabilitation and Apron Reconfiguration Proiect — <br />Construction Administration Phase Services <br />AIRPORT NAME: Kittitas County Airport - Bowers Field r ELN <br />CLIENT: Kittitas County, WA <br />A.I.P. NUMBER: 3-53-0026-023-2024 <br />J-U-B PROJECT NUMBER: 45-23-011 <br />CLIENT PROJECT NUMBER: Click or tap here to enter text. <br />ATTACHMENT TO: <br />® AGREEMENT DATED: ; or <br />❑ AUTHORIZATION FOR ADDITIONAL SERVICES #_; DATED: <br />The referenced Agreement for Professional Services executed between J-U-B ENGINEERS, Inc. (J-U-B) <br />and the CLIENT is amended and supplemented to include the following provisions regarding the Scope of <br />Services, Basis of Fee, and/or Schedule: <br />PART 1 - PROJECT UNDERSTANDING <br />FAA AIP 3-53-0026-023-2024 includes Construction Phase Services for the following items: <br />• East Taxilane Pavement rehabilitation; 5 East Taxilanes located adjacent to the ovals and east of <br />the GA Apron, approximately 2,500 linear feet. <br />• Partial parallel Taxiway B pavement rehabilitation, approximately 1,500 linear feet. <br />• East GA Apron pavement rehabilitation, approximately 850'x275' = 233,750 SF or 25,972 SY. <br />• East GA Apron tie down and associated taxilane marking reconfiguration to allow for larger B-II <br />aircraft operations to include approximately 14 tiedown removals and patching, installing <br />approximately four sets of new tie down anchors and adjusting/re-striping of pavement markings. <br />• Rehabilitation work to include routing and crack fill, wide/large crack filling, asphalt surface <br />treatment (seal coat), surface patching, full depth patching, pavement marking removal, and re - <br />striping of the pavement markings. <br />PART 2 - SCOPE OF SERVICES BY J-U-B <br />J-U-B's Services under this Agreement are limited to the following tasks. Any other items necessary to plan <br />and implement the project, including but not limited to those specifically listed in PART 3, are the <br />responsibility of CLIENT. <br />A. Task 001: Project Management <br />1. Assist the CLIENT with Project Scope development and formulation. J-U-B will prepare a Scope <br />of Services narrative and detailed description of all work tasks for CLIENT and FAA review and <br />approval. Discuss review comments and revise accordingly. <br />2. Prepare a listing of work tasks in a spreadsheet with person -hours, hourly rates, expenses, and <br />costs based on the Scope of Services. J-U-B shall prepare a detailed cost proposal on the <br />spreadsheet, based on estimates of work to accomplish the Scope of Services. <br />J-U-B Agreement for Professional Services <br />Attachment 1 A — Detailed Scope of Work Page 1 <br />