My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-05-14-minutes-solid-waste-and-maintenance
>
Meetings
>
2024
>
06. June
>
2024-06-04 10:00 AM - Commissioners' Agenda
>
2024-05-14-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 12:10:57 PM
Creation date
5/30/2024 12:08:18 PM
Metadata
Fields
Template:
Meeting
Date
6/4/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
118776
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� X F, 0 U�' A S' <br />Structural Solutions <br />Seattle 1011 western A�enua, Srste 8tO V �a!Je, i:' 981U4 i 2 F 292.5G7c <br />Tacoma 1250 Pacific Avenue, SWe 701 ! Taccsna. WA 98402 i 253.383.2797 <br />Portland 101 SW M n Strut. Suite 28D e Port'ar7. OR 97204 i 503.232.3746 <br />www.pcs-strucDwaLcom <br />March 29, 2024 <br />KNIT <br />909 S 33611 St, Suite 107 <br />Federal Way, WA 98003 <br />ATTN: Rhonda Gillogly <br />RE: Kittitas County Jail Renovations — CD/CA Phase <br />Dear Rhonda: <br />Thank you for this opportunity to propose our Structural Engineering services for the Kittitas <br />County Jail Renovations CD/CA Phase. <br />SCOPE OF SERVICES <br />We will provide all structural design, calculations, and marked -up drawings as required <br />toward obtaining the Building Permit for the structural portion of this project. Post permit <br />changes can be provided at additional cost on an hourly basis. <br />Our scope of services and resulting fees are based on the following scope: <br />• Exterior/interior concrete panel cracking repairs. <br />o Coordination with KNIT. Structural drawings are not anticipated, but we will <br />support KNIT with notes/sketches. Up to 16 hours anticipated. <br />• Jail Entry Doors. <br />o Coordination with KNIT. Structural drawings are not anticipated, but we will <br />support KNIT with notes/sketches. Up to 8 hours anticipated. <br />• Mop room/kitchen wall repairs. <br />o Coordination with KNIT. Structural drawings are not anticipated, but we will <br />support KNIT with notes/sketches. Up to 4 hours anticipated. <br />• Rec Yard topping slab. <br />o Coordination with KNIT. Structural drawings are not anticipated, but we will <br />support KNIT with notes/sketches. Up to 4 hours anticipated. <br />• Annex slab on grade repairs. <br />o Coordination with KNIT. Structural drawings are not anticipated, but we will <br />support KNIT with notes/sketches. Up to 4 hours anticipated. <br />• Annex railing extension. <br />o Coordination with KNIT. Structural drawings are not anticipated, but we will <br />support KNIT with notes/sketches. Up to 8 hours anticipated. <br />• Annex control booth enclosure. <br />o Review of architectural pre -design options. Up to 8 hours anticipated. <br />o Coordination with KNIT. Structural drawings are not anticipated, but we will <br />support KNIT with notes/sketches. Up to 24 hours anticipated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.