My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-05-14-minutes-solid-waste-and-maintenance
>
Meetings
>
2024
>
06. June
>
2024-06-04 10:00 AM - Commissioners' Agenda
>
2024-05-14-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 12:10:57 PM
Creation date
5/30/2024 12:08:18 PM
Metadata
Fields
Template:
Meeting
Date
6/4/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
118776
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPCSI <br />Structural Solutions Connected Teams. <br />Bold Solutions. <br />KNIT <br />Rhonda Gillogly <br />Kittitas County Jail Renovations — CD/CA Phase <br />• Rooftop unit <br />o Check existing framing to support new mechanical unit. Anchorage to support <br />structure to be bidder designed. Any structural upgrades will be shown on <br />structural drawings/details. <br />• Maximum of two site visits during design for coordination and to observe existing <br />conditions as needed. <br />• Virtual team coordination meetings as needed throughout design phase (8 meeting <br />assumed). <br />• Construction phase service to include submittal review, structural observation site <br />visits and answering contractor questions. One structural observation site visit is <br />anticipated. <br />• Design schedule is anticipated through end of 2024 and construction phase is <br />anticipated to be 12 months. <br />• Record drawings can be provided on an hourly basis. <br />FEES <br />Our fee proposal for the Structural Engineering services on the above -referenced project is <br />as follows: <br />• Design Phase <br />• CA <br />$ 26,000 <br />16,000 <br />Total $ 42,000 <br />Billing will be on a percentage of completion basis. The fee amount may be modified only <br />with prior written approval if the scope of services is changed. <br />Thank you for this opportunity to be of continued service. If there are any questions <br />regarding this proposal, please feel free to call. We look forward to hearing from you. <br />Very truly yours, <br />PCS STRUCT AL OLUTIONS <br />Wes Neeley, S.E. <br />Associate Principal <br />WJNeml <br />23-702 23702 pro -MCA 2024-03-29 An <br />
The URL can be used to link to this page
Your browser does not support the video tag.