My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-05-14-minutes-solid-waste-and-maintenance
>
Meetings
>
2024
>
06. June
>
2024-06-04 10:00 AM - Commissioners' Agenda
>
2024-05-14-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 12:10:57 PM
Creation date
5/30/2024 12:08:18 PM
Metadata
Fields
Template:
Meeting
Date
6/4/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
118776
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hultz'9HU Engineers ENGINEERING HOURS (253) 333-3257 <br />Ccnsmling Engineers 42511024 <br />Project: Kittitas Jail Improvements <br />Work: Electrical Engineering <br />DESIGN PHASE <br />- <br />Assoc <br />Senior <br />Senior <br />Project <br />Project <br />Senior <br />CAD <br />- <br />Task <br />Pnncioal <br />Pnncioal <br />Engr <br />Proj Mgr <br />Engr <br />Mgr <br />Designer <br />Tech <br />Clerical <br />Site Visit/Field Invesfigation <br />8 <br />Review As.Builts <br />1 <br />0.5 <br />Review Scope/Requirements <br />0.5 <br />E#-Legend/General Notes <br />1 <br />1 <br />E#-Floor Plan(s) <br />10 <br />10 <br />E#-Delails/Panel Schedules <br />4 <br />6 <br />Load Calcis (Healers) <br />3 <br />Update backgrounds <br />1 <br />Catalog Cuts & Revisions <br />NIC <br />System Narratives <br />NIC <br />Specifications - Technical <br />3 <br />1 <br />Formal Specifications <br />1 <br />Arch/Engr/Owner Coordination <br />1 <br />1 <br />Schedule Review <br />0.5 <br />Meetings <br />1 <br />Correspondence Review <br />1 <br />QC Review <br />2 <br />1 <br />0.5 <br />Progress Submittal(s) <br />0.5 <br />2 <br />1 <br />Cost Estimate(s) <br />3 <br />Respond to Review Comments <br />0.5 <br />0.5 <br />0.5 <br />Lighting Energy Code Forms <br />1 <br />Permit Forms Assistance <br />0.5 <br />Hour Total <br />4 <br />0 <br />0 <br />1 0 <br />1 42 <br />0 <br />0 <br />20 <br />2.5 <br />Labor Hourty Rate <br />$220.00 <br />$185.00 <br />$160.00 <br />$145.00 <br />1 $150.00 <br />1 $135.00 <br />$120.00 <br />$95.00 <br />$65 <br />Labor Cost Sub -Totals <br />$880 <br />SO <br />30 <br />30 <br />1 $6,300 <br />1 $0 <br />$0 <br />$1,900 <br />1 $163 <br />DESIGN <br />PHASE <br />TOTAL: $9,243 <br />BID PHASE <br />- <br />Assoc <br />Senior <br />Senior <br />Project <br />Project <br />Senior <br />CAD <br />- <br />Task <br />Principal <br />Principal <br />Engr <br />Pro' M r <br />En r <br />Mgr <br />Designer <br />Tech <br />Clerical <br />Pre -Bid Meeting <br />NIC <br />Correspondence Review <br />NIC <br />Substitution Request Review <br />1 <br />Bidder Questions <br />1 <br />Addenda <br />1 <br />1 <br />Hour Total <br />0 <br />0 <br />0 <br />0 <br />3 <br />0 <br />0 <br />0 <br />1 <br />Labor Houd Rate <br />$220.00 <br />$185.00 <br />$160.00 <br />$145.00 <br />$150.00 <br />$135.00 <br />5120.00 <br />595.00 <br />S65.00 <br />Labor Cost Sub -Totals <br />1 $0 <br />1 SO <br />I SO <br />1 $0 <br />1 $450 <br />$0 <br />so <br />I so <br />1 $65 <br />BID PHASE <br />TOTAL: $515 <br />CONSTRUCTION PHASE <br />- <br />Assoc <br />Senior <br />Senior <br />Project <br />Project <br />Senior <br />CAD <br />Task <br />Principal <br />Principal <br />Engr <br />Proj Mgr <br />Engr <br />Mgr <br />Designer <br />Tech <br />Clerical <br />Pre -Con Meeting <br />NIC <br />Submittal Reviews <br />8 <br />Re-Subnuttal Reviews <br />2 <br />Submittal Coordination/Lists <br />NIC <br />Correspondence Review <br />2 <br />Meeting Minutes Reviews <br />2 <br />Site Visits <br />SEE MECHANICAL <br />RFI's <br />1 <br />2 <br />Changes/COP/CP Reviews <br />NIC <br />Pay Reviews <br />2 <br />Punchlisl <br />8 <br />Backcheck <br />NIC <br />Hour Total <br />1 <br />1 0 <br />0 <br />0 <br />26 <br />0 <br />0 <br />0 <br />0 <br />Labor Houd Rate <br />S220.00 <br />S185.00 <br />$160.00 <br />$145.00 <br />$150.00 <br />S135.00 <br />S120.00 <br />$95.00 <br />$65.00 <br />Labor Cost Sub -Totals <br />$220 <br />1 $0 <br />SO <br />1 $0 <br />1 $3,900 <br />1 $0 <br />1 $0 <br />1 $0 <br />1 50 <br />CONSTRUCTION PHASE <br />TOTAL: $4,120 <br />CLOSEOUT PHASE <br />Task <br />- <br />Principal <br />Assoc <br />Principal <br />Senior <br />Engr <br />Senior <br />Pro M r <br />Project <br />En r <br />Project <br />Mgr <br />Senior <br />Designer <br />CAD <br />Tech <br />- <br />Clerical <br />Closeout Review-As-Builts <br />Closeout Review - O&M <br />Closeout Review -Elec Tests <br />Acad As-Builts <br />NIC <br />NIC <br />0.5 <br />0.5 <br />Hour Total <br />D <br />0 <br />0 <br />1 0 <br />1 t <br />1 0 <br />10 <br />0 <br />0 <br />Labor Hourly Rate <br />1 S220.00 <br />1 $185.00 <br />$160.00 <br />$145.00 <br />$150.00 <br />$135.00 <br />$120.00 <br />1 $95.00 <br />1 $65.00 <br />Labor Cost Sub -Totals <br />SO <br />I so <br />so <br />$0 <br />$150 <br />SO <br />s0 <br />I $0 <br />I SO <br />CLOSEOUT <br />PHASE <br />TOTAL: <br />$150 <br />TOTAL ALL PHASES: $14,028 <br />Hourly Rates <br />Assoc Senior Senior Project Project Senior CAD - <br />Princioal Principal Engr Proj Mgr Engr M r Desi ner ITech Clerical <br />$220.00 1 $185.00 $160.00 1 $145.00 $150.00 $135.00 1 $120.00 1 $95.00 1 365.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.