My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-05-14-minutes-solid-waste-and-maintenance
>
Meetings
>
2024
>
06. June
>
2024-06-04 10:00 AM - Commissioners' Agenda
>
2024-05-14-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 12:10:57 PM
Creation date
5/30/2024 12:08:18 PM
Metadata
Fields
Template:
Meeting
Date
6/4/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
118776
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 25, 2024 <br />KNIT <br />Kittitas County Jail Facility Renovations <br />Page 2 <br />Proposed Fee <br />Design and Bid Phases: We propose to provide our design phase services on a lump sum fee basis as <br />follows: <br />Discipline <br />Design <br />Bid <br />Total <br />Mechanical <br />$ 20,448 <br />$ 925 <br />$ 21,373 <br />Electrical <br />$ 9,243 <br />$ 515 <br />$ 9,758 <br />Total <br />$ 29,690 <br />$ 1,440 <br />$ 31,130 <br />Reimbursable <br />for design and bid phases: <br />Miles <br />Total Cost <br />Item <br /># Trips <br />per Trip <br />Miles Per Mile <br />Amt <br />Mileage <br />3 <br />276 <br />828 0.67 <br />$555 <br />Printing <br />- <br />- <br />- - <br />$250 <br />Total <br />$805 <br />Total fee for design phase = $ 31,935 <br />Construction/Closeout Phases: We propose to provide our construction and closeout phase services on <br />an hourly charge basis, not to exceed (NTE) our authorized fee without your prior permission. <br />Discipline <br />CA <br />CO Total <br />Mechanical <br />$14,380 <br />$ 225 $ 14,605 <br />Electrical <br />$ 4,120 <br />$ 150 $ 4,270 <br />Total <br />$18,500 <br />$ 375 $18,875 <br />Reimbursable for onstruction, closeout phases: <br />Miles Total Cost <br />Phase # Trips per Trip Miles Per Mile Amt <br />CA 7 276 1932 0.67 $1,294 <br />Total NTE fee for bid/construction/closeout phases = $ 20,169 <br />See the attached for expected tasks, hours, and hourly rates. <br />Assumptions/Qualifiers <br />1. We assume we will be provided AutoCAD (or Revit) compatible backgrounds of the building. <br />2. We assume that mechanical, electrical, and plumbing as-builts will be provided to us, and that they <br />are reasonably accurate. <br />3. Fire sprinkler systems will be covered by a performance specification and drawing notes with final <br />with design by the installing contractor. <br />4. Electrical metering of existing loads is not included. <br />5. We assume that any design phase meetings will be the virtual type. <br />
The URL can be used to link to this page
Your browser does not support the video tag.