My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-01-09-minutes-solid-waste-and-maintenance
>
Meetings
>
2024
>
01. January
>
2024-01-16 10:00 AM - Commissioners' Agenda
>
2024-01-09-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 12:26:19 PM
Creation date
1/11/2024 12:22:32 PM
Metadata
Fields
Template:
Meeting
Date
1/16/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
113090
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Patti Stacey <br />From: Josh Mattson <mattsonj@ci.ellensburg.wa.us> <br />Sent: Friday, December 1, 2023 2:02 PM <br />To: Patti Stacey <br />Cc: Betsy Dunbar, Derek Mayo <br />Subject: 5th Ave Sidewalk at the County Courthouse <br />Attachments: CBD 5th Ave at KC Engineers Estimate.xlsx <br />Follow Up Flag: <br />Follow up <br />Due By: <br />Monday, December 4, 2023 10:00 AM <br />Flag Status: <br />Flagged <br />Categories: Important <br />CAUTION: This email originated from outside the Kittitas County network. Do not click links, open attachments, <br />fulfill requests, or follow guidance unless you recognize the sender and have verified the content is safe. <br />Hi Patti, <br />Here's the follow up pricing we promised at yesterday's meeting with you and Bryan for the sidewalk replacement <br />options on 51h Ave at the County Courthouse. Just a few notes: <br />• We added a 10% contingency for a more conservative bottom line estimate. <br />• The City would only assist with design, bidding and construction administration for a pavestone installation <br />project, which is Option 1 in the attached estimate. <br />• We included pricing for replacement of the wall and concrete steps at the back of sidewalk. Replacing the <br />landscaping area and curb behind the wall with asphalt to widen the parking lot was not included in the cost and <br />would need to be permitted through Community Development. Please reach out to them for more guidance. <br />• Here's the link to the City Code for sidewalk maintenance: <br />https://library.municode.com/wa/eliensburg/codes/code of ordinances?node ld=TIT4PUW0 CH4.14SICUGU 4. <br />14.120MASIDR <br />Thank you and let me know if you have any questions. <br />Josh <br />Josh Mattson <br />Assistant City Engineer I City of Ellensburg <br />501 North Anderson Street I Ellensburg, WA 98926 <br />P. (509) 925-8699 <br />mattsonj@ellensburgwa.aov <br />www.ellensburgwa.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.