Laserfiche WebLink
5th Ave Sidewalk Improvements Estimate <br />North Side - Water St to Main St <br />City Proj. No. 23-025 <br />Date: 12-1-2023 <br />Option 1 - PaversWrte Installation <br />6' Wide Pavemone Walkway, 1' Wide Concrete Retaining Strips, 7' Wide Rock Lined Planter Strip with Trees <br />Bldltem No. <br />Spec Section <br />Bid Item <br />Unit Quantity Unit Price <br />Total <br />1 <br />1-04 <br />Minor Change <br />EST <br />1 $ 7,5D0.D0 $ <br />7,500.00 <br />2 <br />1-09 <br />Mobilization <br />IS <br />1 $ 15,0D0.00 $ <br />15,000.00 <br />3 <br />1-10 <br />Project Temporary Traffic Control <br />LS <br />1 $ 5,000.00 $ <br />5,DD0.00 <br />4 <br />2-01 <br />Clearing and Grubbing <br />L5 <br />1 $ 5,0D0.00 $ <br />5,000.00 <br />5 <br />2-02 SP <br />Remove Cement Conc Sidewalk <br />SY <br />250 $ 20.D0 $ <br />5,000.00 <br />6 <br />2-12 <br />Constwctlon Geotextile for Separation <br />SY <br />200 $ 3.00 $ <br />600.00 <br />7 <br />4-04 <br />Crushed Surfacing Top Course <br />TN <br />30 $ 75.00 $ <br />2,250.00 <br />8 <br />8-01 <br />Eroslon[Water Pollution Control <br />EA <br />2 $ 2D0.00 $ <br />400.00 <br />9 <br />8-02 SP <br />Plant Selection Flowering Cherry"Royal Burgundy" <br />EA <br />7 $ 1,250.00 $ <br />8,750.00 <br />10 <br />8-02 SP <br />Clean Fractured Rock 2"-4" <br />TN <br />60 $ 60.00 $ <br />3,600.00 <br />11 <br />8-03 SP <br />Irrigation System <br />LS <br />1 $ 5,D00.00 $ <br />5,000.D0 <br />12 <br />8-04 <br />Cement Cont. Traffic Curb and Gutter <br />LF <br />15 $ 75.00 $ <br />1,125.D0 <br />13 <br />8-14 <br />Cement Conc. Sidewalk Retaining Strips <br />SY <br />60 $ 80.00 $ <br />4,800.00 <br />14 <br />8-14 <br />Brick Paver Sldewalk <br />SY <br />150 $ 200.00 $ <br />30,000.00 <br />15 <br />8-14 <br />Brick Paver Decorative Patterns <br />EA <br />8 $ 175.00 $ <br />1,400.00 <br />16 <br />8-14 <br />Detectable Warning Surface <br />SF <br />24 $ 60.00 $ <br />1,440.00 <br />17 <br />8-20 SP <br />Illumination System- Historic 3 Globe Poles <br />IS <br />1 $ 35,OD0.00 $ <br />35,000.00 <br />17 <br />8-32 SP <br />Transit Shelter with Bench <br />EA <br />1 $ 15,000.00 $ <br />15,000.00 <br />17 <br />8-325P <br />Bike Rack <br />EA <br />1 $ 1,000.00 $ <br />1,000.00 <br />17 <br />8-325P <br />Garbage Can <br />EA <br />1 $ 1.500.00 $ <br />1,500.00 <br />Sub -Taal $ <br />149,365.00 <br />Contingency(10%) $ <br />14,936.50 <br />Total $ 164,301.50 <br />75%County Share - Paverstone $ <br />79,913.63 <br />25%City Share - Paverstone $ <br />26,637.88 <br />0%County Share - Transit $ <br />- <br />100%CityShe— Transit $ <br />19,250.D0 <br />50%County <br />Share - Illumination $ <br />19,250.00 <br />50%City Share -Illumination $ <br />19,250.00 <br />Total County Share $ <br />99,163.63 <br />Total City Share $ <br />65,137.98 <br />Option 2 - Concrete Sidewalk Replacement- <br />B' Wide Concrete Sidewalk, T Wide Rock Lined Planer Strip with Trees <br />Bidltem No. <br />Spec Section <br />Bid Item <br />Unit Quantity <br />Unit Price <br />Total <br />1 <br />1-04 <br />Minor Change <br />EST <br />1 $ <br />5,DD0.00 $ <br />5,000.00 <br />2 <br />1-09 <br />Mobilization <br />LS <br />1 $ <br />10,000.D0 $ <br />10,000.00 <br />3 <br />1-10 <br />Project Temporary Traffic Control <br />LS <br />1 $ <br />5,000.00 $ <br />5,000.00 <br />4 <br />2-01 <br />Clearing and Grubbing <br />LS <br />1 $ <br />5,000.D0 $ <br />5,000.00 <br />5 <br />2-025P <br />Remove Cement Conc Sidewalk <br />SY <br />260 $ <br />20.00 $ <br />5,200.00 <br />7 <br />4-04 <br />Crushed Surfacing Top Course <br />TN <br />30 $ <br />75.D0 $ <br />2,250.00 <br />8 <br />8-01 <br />Eroslon/Water Pollution Control <br />EA <br />2 $ <br />200.00 $ <br />400.00 <br />9 <br />8-025P <br />Plant Selection Flowering Cherry uRoyal Burgundy" <br />EA <br />7 $ <br />1,250.00 $ <br />8,750.00 <br />10 <br />8-025P <br />Clean Fractured Rock 2"-4" <br />TN <br />60 $ <br />60.00 $ <br />3,600.00 <br />11 <br />8-03 SP <br />Irrigation System <br />LS <br />1 $ <br />5,000.00 $ <br />5,000.00 <br />12 <br />8-04 <br />Cement Conc Traffic Curb and Gutter <br />LF <br />15 $ <br />75.00 $ <br />1,125.00 <br />13 <br />8-14 <br />Cement Conc Sidewalk <br />SY <br />200 $ <br />75.00 $ <br />15,000.00 <br />16 <br />8-14 <br />Detectable Warning Surface <br />SF <br />24 $ <br />60.00 $ <br />1,440.00 <br />17 <br />8-205P <br />Illumination System- Replace Existing Pale <br />LS <br />1 $ <br />10,DD0.00 $ <br />10,000.00 <br />17 <br />8-32 SP <br />Transit Shelterwith Bench <br />EA <br />1 $ <br />15,000.00 $ <br />15,000.00 <br />17 <br />8-325P <br />Bike Rack <br />EA <br />1 $ <br />1,OD0.00 $ <br />1,000.00 <br />17 <br />8-325P <br />Garbage Can <br />EA <br />1 $ <br />1,500.D0 $ <br />1,500.00 <br />Sub -Total $ 95,265.D0 <br />Contingency (10%) $ 9,526.50 <br />Total $ 104,791.50 <br />100% County Share -Sidewalk $ 74,541.50 <br />0%City Share -Sidewalk $ - <br />0%County Share-Tramit $ - <br />100%City Share- Transit $ 19,250.00 <br />100% County Share - Illumination $ 11,t100.D0 <br />0%City Share - Illumination $ - <br />Total CountyShare $ 85,541.50 <br />Total City Share• $ 19,250.00 <br />• -City Participation will be limited to installation of transit Improvements following completion of <br />sidewalk work by the County. No City design,bidding, or construction assistance will be provided for this option. <br />Optional Bid Additive - Remove <br />and Replan Existing Wall <br />Bidltem No. <br />Spec Section Bid Item <br />Unit Quantity <br />Unit Price <br />Total <br />1 <br />1-04 <br />Minor Change <br />EST <br />1 $ <br />5,000.00 $ <br />5,000.00 <br />2 <br />1-09 <br />Mobilization <br />LS <br />1 $ <br />6,000.00 $ <br />6,000.00 <br />3 <br />1-10 <br />Project Temporary Traffic Control <br />LS <br />1 $ <br />2,500.00 $ <br />2,500.00 <br />4 <br />2-025P <br />Remove Cement Conc. Wall <br />SF <br />6D0 $ <br />5.00 $ <br />3,000.00 <br />5 <br />8-315P <br />Cement Conc Steps <br />SY <br />6 $ <br />250.00 $ <br />1,500.00 <br />6 <br />8-315P <br />Modular Block Wall <br />SF <br />600 $ <br />60.00 $ <br />36,000.00 <br />Sub-Tatal $ <br />54,000.00 <br />Contingency (10%) $ <br />5,400.00 <br />Total $ 59,400.00 <br />1DD%County Share -Wall $ 59,400.001 <br />0%CityShare-Wall $ - <br />Total CountyShare $ 59,400.00 <br />Total CityShare• $ <br />