My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023 Docket Enabling Ordinance
>
Meetings
>
2023
>
12. December
>
2023-12-19 10:00 AM - Commissioners' Agenda
>
2023 Docket Enabling Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2023 12:18:03 PM
Creation date
12/14/2023 12:16:18 PM
Metadata
Fields
Template:
Meeting
Date
12/19/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Ordinance for the 2023 Annual Docket Amendments to Kittitas County Code and Comprehensive Plan
Order
12
Placement
Consent Agenda
Row ID
112272
Type
Ordinance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2023 Docket Enabling Ordinance December 19, 2023 <br />Page 158 <br /> <br /> <br />1. Required Notice: Three working day notice prior to each of critical stages such <br />as placing foundation piling or footings, placement and assembly of major <br />components, and completion of structure and approaches. <br />2. Inspection Details: Tests and certification requirements will be as directed by <br />the County Engineer. <br />L. Final Inspection: <br />1. Required Notice: Five working day notice. <br />2. Inspection Details: Overall check of project site, to verify completion of paving <br />and associated appurtenances and improvements, traffic control devices, <br />electrical systems, utility installation, cleaning of drainage system, edge <br />restoration, seeding, planting, and all necessary clean-up in accordance with <br />the approved plans and these standards. <br />3. Additional Requirements: Prior to final approval of construction work, <br />acceptance for maintenance and release of construction performance bonds, <br />the developer/contractor shall pay any required fees, submit any required <br />maintenance and defect financial guarantees, provide certification of <br />monumentation and submit one mylar set of corrected plans (as-built) <br />reflecting all minor and design plan changes of the roadway and drainage <br />systems. The Department of Public Works shall specify the number of mylar <br />sets as warranted by the type of improvement. Mylars shall not have any <br />shading or adhesive addition in any areas. If original plans were completed on a <br />CADD system, the developer/contractor shall submit, in addition to mylars, a <br />copy of the CADD drawing files in .DWG format. <br />M. Final Maintenance Inspection: <br />1. Required Notice: 30 days prior to the end of the maintenance period. <br />2. Inspection Details: Overall check of work associated with a maintenance <br />guarantee. <br />3. Additional Requirements: Prior to release of the maintenance guarantee, there <br />shall be successful completion of the maintenance period as described KCC
The URL can be used to link to this page
Your browser does not support the video tag.