Laserfiche WebLink
2023 Docket Enabling Ordinance December 19, 2023 <br />Page 157 <br /> <br /> <br />2. Inspection Details: To verify that crushed surfacing has been placed and <br />compacted in accordance with the approved plans, and these standards. If the <br />scope of the project is such that the crushed surfacing is completed in stages, <br />each such stage shall be inspected separately. <br />G. Curb and Sidewalk Forming: <br />1. Required Notice: Two working day notice. Inspection must be complete prior <br />to pouring concrete. <br />2. Inspection Details: To verify proper forming and preparation for concrete in <br />accordance with the approved plans, and these standards. If the scope of the <br />project is such that forming of curb and sidewalk is completed in stages, each <br />such stage shall be inspected separately. <br />H. Curb and Sidewalk Placement: <br />1. Required Notice: Two working day notice. <br />2. Inspection Details: To check placement of concrete in accordance with the <br />approved plans, and these standards. <br />I. Pre-Paving: <br />1. Required Notice: Two working day notice. <br />2. Inspection Details: Prior to paving, to verify that all work to date has been <br />constructed in accordance with the approved plans, and these standards. <br />J. Paving: <br />1. Required Notice: Three working day notice in advance of paving with hot mix <br />asphalt or Portland cement concrete. <br />2. Inspection Details: To verify paving and compaction, or placement of concrete <br />roadway is in accordance with the approved plans, and these standards. <br />K. Structural: