My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023 Docket Enabling Ordinance
>
Meetings
>
2023
>
12. December
>
2023-12-19 10:00 AM - Commissioners' Agenda
>
2023 Docket Enabling Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2023 12:18:03 PM
Creation date
12/14/2023 12:16:18 PM
Metadata
Fields
Template:
Meeting
Date
12/19/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Ordinance for the 2023 Annual Docket Amendments to Kittitas County Code and Comprehensive Plan
Order
12
Placement
Consent Agenda
Row ID
112272
Type
Ordinance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2023 Docket Enabling Ordinance December 19, 2023 <br />Page 156 <br /> <br /> <br />Subsequent inspections may be required at the discretion of the County <br />Engineer as necessary to ensure continued proper operation and maintenance <br />of temporary sedimentation and erosion control for the duration of <br />construction. <br /> <br />C. Utility and Storm Drainage Installation: <br />1. Required Notice: Two working day notice prior to trenching and placing of <br />storm drainage systems. <br />2. Inspection Details: To verify that underground storm drainage facilities, <br />including but not limited to pipes, catch basins, and manholes have been <br />constructed in accordance with the approved plans and these standards. <br />Inspection shall take place prior to backfill. If cover is installed in stages, <br />multiple inspections shall be scheduled as necessary to ensure that all facilities <br />receive inspection. <br />D. Utility and Storm-Drainage Backfill and Compaction: <br />1. Required Notice: Two working day notice before backfill and compaction of <br />storm drainage systems. <br />2. Inspection Details: Verify that backfill for all trenching within the roadway, <br />existing right of way, and future right of way is in compliance with the approved <br />plans and these standards. <br />E. Subgrade Completion: <br />1. Required Notice: Two working day notice at stage that underground utilities <br />and roadway grading are complete. <br />2. Inspection Details: To verify that the subgrade has been constructed and <br />graded in compliance with the approved plans and these standards. If the <br />subgrade and surfacing is installed in stages, multiple inspections shall be <br />scheduled as necessary to ensure that all subgrade has been inspected. <br />F. Crushed Surfacing Placement: <br />1. Required Notice: Two working day notice.
The URL can be used to link to this page
Your browser does not support the video tag.