My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-11-13-minutes-public-works-study-session
>
Meetings
>
2023
>
11. November
>
2023-11-21 10:00 AM - Commissioners' Agenda
>
2023-11-13-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 2:04:24 PM
Creation date
11/16/2023 1:46:28 PM
Metadata
Fields
Template:
Meeting
Date
11/21/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
111109
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction project manager to direct a work stop. WSDOT and Contractor forces to aid in clearing traffic in <br />the work area and near vicinity. <br />Traffic Control Implementation: Smart Work Zone System, traffic delay signs and existing VMS's will be utilized <br />used to provide advanced notification to motorists. Traffic delay signs placed in Cle Elum MP 82.71, Ellensburg <br />MP 107.47, George MP 154.62 and Ritzville MP 226.42 will be set to 1-90 closed. <br />Implement a wide scale detour through the following: <br />Responsibility for detour set and response time <br />Highway and Ramp Closures Needed (west to east): <br />Highway closure at Kittitas <br />1-90 EB on ramp at Kittitas <br />1-90 WB on -ramp at Huntzinger RD <br />1-90 EB off ramp at Huntzinger Road <br />SR 26 WB <br />Silica WB ramp <br />Highway closure at George <br />1-90 WB on ramp at George <br />11 <br />k1e ftir <br />Large Scale Graphic - Wildfire on the West Side of the Bridse.docx <br />Which agency can respond to set up and manage? Time to respond? <br />Wildfire (Large event. Small events can be scaled) <br />East of the project area. Assume north to south prevailing winds. <br />Assume a grass fire start on the east bound lanes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.