Laserfiche WebLink
Construction project manager to direct a work stop. WSDOT and Contractor forces to aid in clearing traffic in <br />the work area and near vicinity. <br />Traffic Control Implementation: Smart Work Zone System, traffic delay signs and existing VMS's will be utilized <br />used to provide advanced notification to motorists. Traffic delay signs placed in Cle Elum MP 82.71, Ellensburg <br />MP 107.47, George MP 154.62 and Ritzville MP 226.42 will be set to 1-90 closed. <br />Implement a wide scale detour through the following: <br />Responsibility for detour set and response time <br />Highway and Ramp Closures Needed (west to east): <br />Highway closure at Kittitas <br />1-90 EB on ramp at Kittitas <br />1-90 WB on -ramp at Huntzinger RD <br />1-90 EB off ramp at Huntzinger Road <br />SR 26 WB <br />Silica WB ramp <br />Highway closure at George <br />1-90 WB on ramp at George <br />11 <br />k1e ftir <br />Large Scale Graphic - Wildfire on the West Side of the Bridse.docx <br />Which agency can respond to set up and manage? Time to respond? <br />Wildfire (Large event. Small events can be scaled) <br />East of the project area. Assume north to south prevailing winds. <br />Assume a grass fire start on the east bound lanes. <br />