My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-11-13-minutes-public-works-study-session
>
Meetings
>
2023
>
11. November
>
2023-11-21 10:00 AM - Commissioners' Agenda
>
2023-11-13-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 2:04:24 PM
Creation date
11/16/2023 1:46:28 PM
Metadata
Fields
Template:
Meeting
Date
11/21/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
111109
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EMS will approach the site from George or Ellensburg, depending upon availability. Head -to -head traffic will be <br />stopped by blocking both lanes of traffic on either side of the work zone. If traffic can move around the lane <br />that the collision occurred in, barricades will be opened and traffic on the bridge released in the forward <br />direction only, keeping oncoming traffic off the bridge. When the unaffected lane is cleared, vehicles in the <br />affected lane will be flagged to leave the bridge in the forward direction only, keeping oncoming traffic from <br />entering the bridge. When traffic in both lanes has been cleared, EMS will enter the bridge deck. In the event <br />air support is required, EMS will bring the patient to the wide area in the gravel road between 1-90 and SR 26 <br />for transport, or to the Vantage Stockpile Site, and or as directed with WSP support. <br />Will incident response team (IRT) and or tow be available? <br />If both lanes (or the single lane for the center deck) are blocked and a wrecker and roll off truck are required, <br />WSDOT will work with the contractor to clear the deck or lane. Once the accident and traffic have been cleared <br />the wrecker and EMS can enter the deck. <br />Wildfire (Large Event -Small events can be scaled) <br />West of the project area. Assume North to South Prevailing Winds <br />Assume a grass fire start on the west bound lanes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.