Laserfiche WebLink
Construction project manager to direct a work stop. WSDOT and Contractor forces to aid in clearing traffic in <br />the work area and near vicinity. Sweep incident area to make sure no vehicles remain. <br />Traffic Control Implementation: SWZS, traffic delay signs and existing VMS's will be utilized used to provide <br />advanced notification to motorists. Traffic delay signs placed in Cie Elum MP 82.71, Ellensburg MP 107.47, <br />George MP 154.62 and Ritzville MP 226.42 will be set to 1-90 closed. <br />Implement a wide scale detour through the following, <br />Responsibility for detour set and response time <br />Highway and Ramp Closures Needed (east to west): <br />Highway closure at George <br />1-90 WB on ramp at George <br />Interchange at Silica — Keep open? The highway may be the fastest route out of the area. <br />Turn SR 26 EB traffic at SR 243 <br />EB on ramp at Huntzinger <br />Highway closure at Kitdtas <br />1-90 EB ramp at Kittitas <br />RC.-.LrAST Of P�'4 <br />tea* fe <br />h <br />F1 <br />�''.r•�'a;.�,��., L+ate <br />/Vs <br />Lar a Scale Graphic - Wildfire on the East Side of the Brid e.docx <br />Which agency can respond to set up and manage? Time to respond? <br />Dust Storm <br />Road closures if visibility is poor (with WSP and WSDOT concurrence). <br />Implement road closure procedures <br />Amber Alert or Other Police Pursuit <br />5 <br />I <br />+ <br />' <br />r + <br />ji Fifr�Y <br />*I <br />1 <br />I <br />,t <br />