Laserfiche WebLink
Phase 1 of the new facility campus at the airport <br />site consists of the Government Building and the <br />Courthouse building. The buildings are adjacent <br />but separated with a area separation joint to allow <br />a separate construction type at the Courthouse <br />because it has a higher construction classification <br />being an essential facility. The courthouse is typically <br />a higher cost per square foot for finishes, security, <br />and Category III essential facility. The government <br />departments will be in the separate building with a <br />shared entrance and security screening point. <br />The site orientation with shared entrance is based <br />on a civic plaza on the east side of the building. This <br />space provides a welcoming entrance for the County <br />departments, a place for meeting and reflection as <br />people come to the courthouse, and outdoor space <br />for staff. <br />Parking for the public, staff, County vehicles, and secure <br />access for the future jail and Sheriff office have been <br />developed on this site to ensure it can accommodate <br />the needs identified. <br />The red buildings of the jail and Sheriff office are <br />provided as Phase 2 construction of the campus <br />and will be required to be issued as a separate bond <br />measure in the future. <br />The property directly to the east of the campus has <br />been preserved for development by other agencies or <br />communities in Kittitas County such as community <br />support, programs, restaurants, shops, etc. <br />Kittitas Count Cot.rrth'ouse Re Iacemen <br />RE -DESIGN REPORT JUNE 14, 2022 7 <br />