My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-14-minutes-solid-waste-and-maintenance
>
Meetings
>
2023
>
08. August
>
2023-08-01 10:00 AM - Commissioners' Agenda
>
2022-06-14-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 12:33:45 PM
Creation date
7/27/2023 12:29:31 PM
Metadata
Fields
Template:
Meeting
Date
8/1/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
106478
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT SITE <br />The preferred site for the new facility has been <br />selected property to the south of the airport. This <br />location has opportunity for continued development, <br />expansion for the growing needs, and access for <br />both Upper and Lower County citizens. <br />Thorough investigation of the existing downtown site <br />was done in tandem to the Airport site. Downtown <br />infrastructure is highly desirable and access for all <br />people within the city of Ellensburg. The available <br />resources in Downtown Ellensburg is a benefit to the <br />operations of the court. However, the available land <br />at the existing location is highly limited for growth <br />and development as the needs for the courthouse <br />grows. The existing facility is highly restrictive <br />for growth and is currently highly undersized. The <br />6 DDLRGROUP <br />existing conditions were not physically assessed <br />by DLR Group as part of the scope of work, but <br />were described as end of useful life for the required <br />systems throughout all County buildings. <br />To build the required needs for the County <br />Downtown, a parking garage would be required in the <br />preliminary phases of construction in the Downtown <br />core. <br />Additionally, the adjacency of the jail to the <br />courthouse imposed significant construction <br />security concerns during the redevelopment of the <br />courthouse. By constructing in a new location, the <br />courthouse and government departments can stay <br />fully operational until the campus is completed and <br />available for moving in. <br />
The URL can be used to link to this page
Your browser does not support the video tag.