My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-13-minutes-public-works-study-session
>
Meetings
>
2023
>
02. February
>
2023-02-21 10:00 AM - Commissioners' Agenda
>
2023-02-13-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:39:41 PM
Creation date
2/16/2023 1:35:25 PM
Metadata
Fields
Template:
Meeting
Date
2/21/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
99860
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATERSHED <br />SCIENCE x ENGINEERING February 1, 2023 <br />Task 3. Development Impact Assessment <br />Based on results from Task 2, MFA will revise the proposed development plan to accommodate the <br />preferred flood reduction alternative. WSE will complete the following tasks to assess potential flood <br />impacts of full buildout conditions under the revised plan. <br />Task 3.1. Flood Review of Proposed Development <br />WSE will: <br />Create figures that overlay the proposed development plan on top of the flood inundation extents <br />and BFEs. This will identify the areas of planned development that will be impacted by flooding. <br />• WSE will present the figures to the County, MFA, and stakeholders in a virtual meeting. The results <br />and potential required development refinements will be discussed. <br />Deliverables: Figures overlaying proposed development concept on flood extents and BFEs. <br />Assumptions: WSE and will participate in up to two virtual meetings with MFA to discuss development <br />alternatives. MFA and the stakeholders will select a preferred development concept. MFA will refine it to <br />reflect recommendations expressed during the stakeholder meeting, and will develop a conceptual full <br />buildout plan. <br />Task 3.2. Floodplain Impact and Compensatory Storage Assessment <br />WSE will update the preferred alternative hydraulic model to incorporate the proposed development full <br />buildout fill plan, run the model to simulate the 1% AEP flood, and compare results to baseline conditions <br />to document changes in floodplain BFEs, inundated extents, and flood storage. The purpose will be to <br />evaluate potential flood impacts and compensatory storage requirements of full buildout conditions. <br />Results will be provided to the County and project stakeholders to support land use planning discussions. <br />Deliverables: <br />Figures comparing BFEs and flood inundation for full buildout conditions to baseline conditions to support <br />floodplain impacts assessment and compensatory storage requirements for the proposed development <br />Assumption: <br />Fill extents for the full buildout condition would be determined by MFA and the County. The County will <br />provide a LandXML including grading/fill for each land use alternative to WSE for incorporation into the <br />hydraulic model. <br />Task 3.3. Technical Memorandum <br />WSE will prepare a letter report to document the floodplain impacts and compensatory storage <br />requirements for the full buildout condition. The memorandum will also include descriptions of additional <br />floodplain development factors that will need to be evaluated/considered if the stakeholder group decides <br />to advance the preferred alternative (e.g. a FEMA conditional letter of map revision (CLOMR), <br />compensatory storage requirements, floodplain impacts that will need to be mitigated). The memorandum <br />will be submitted to the County for review. WSE will finalize the memorandum upon receipt of comments. <br />Deliverables: <br />Draft Memorandum <br />Final Memorandum <br />
The URL can be used to link to this page
Your browser does not support the video tag.