My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023 - 2028 Six-Year Capital Improvement Plan
>
Meetings
>
2022
>
12. December
>
2022-12-20 2:00 PM - 2:00pm Public Hearing
>
2023 - 2028 Six-Year Capital Improvement Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2022 12:19:36 PM
Creation date
12/15/2022 12:17:12 PM
Metadata
Fields
Template:
Meeting
Date
12/20/2022
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Public Hearing to consider Capital Improvement Program for the Planning Period 2023-2028.
Order
2
Placement
2:00pm Public Hearing
Row ID
97391
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CRP/RC #: 311-21 <br />Location: MP 1.35– MP 1.85 <br />Bowers Road, Ellensburg <br />Project Number: RC2293-F1 Length: 0.5 miles <br />Basis for Project: Improvements, increased drainage. Construction: 2022 <br />Project Description: <br />Sidewalks provide an important transportation connection. As sidewalks deteriorate they become hazardous. It is also im- <br />portant to ensure connectivity from one sidewalk section to another. Multiple sections of sidewalk on Airport Road have buck- <br />led. Improvements will be made to the sidewalk on Airport Road to ensure connectivity, ADA compliance and repair deterio- <br />rated sidewalk segments. This sidewalk fronts County Airport property. <br />Status: Design and construction to occur in 2022. <br />TrafÕc Impacts: Minimal, but TBD. <br />For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us <br />Funding Source: <br />Local $65,000 <br />Total: $65,000 <br />Airport Road Sidewalk <br />Replacement 11
The URL can be used to link to this page
Your browser does not support the video tag.