Laserfiche WebLink
<br />CRP/RC #: <br />Location: Cle Elum to Roslyn <br />Last Updated: 8/29/2022 <br /> <br />Project Number: Length: 1.11 miles <br />Basis for Project: Safety Improvements/Countermeasures Construction: 2024 <br />Project Description: <br />Develop a paved path that would extend from the existing paved path that currently ends at Cle Elum/Roslyn School. The <br />path would cross State Route 903 at the intersection of Alliance Road, travel along Shaft Street to E South Avenue in Roslyn. <br />This path will provide an increase in safety for pedestrians and cyclist. <br /> <br />Status: Planned for design and Right of Way in 2022-2023 and construction in 2024. <br />TrafÕc Impacts: TBD <br />For more informaƟon on this project, contact Mark Cook @ 509-962-7692 or mark.cook@co.kiƫtas.wa.us <br />Progress Path-Phase 2 <br />Cle Elum To Roslyn <br />Funding Source: <br />Safe routes <br />to school <br />Local <br /> $355,000 <br />$55,000 <br />Total: $410,000 <br />12