My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023 - 2028 Six-Year Capital Improvement Plan
>
Meetings
>
2022
>
12. December
>
2022-12-20 2:00 PM - 2:00pm Public Hearing
>
2023 - 2028 Six-Year Capital Improvement Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2022 12:19:36 PM
Creation date
12/15/2022 12:17:12 PM
Metadata
Fields
Template:
Meeting
Date
12/20/2022
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Public Hearing to consider Capital Improvement Program for the Planning Period 2023-2028.
Order
2
Placement
2:00pm Public Hearing
Row ID
97391
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CRP/RC #: 310-21 <br />RESOLUTION #: 2021-202 <br />Location: MP 5.17–MP 5.33, Vantage Hwy <br />Last Updated: 8/29/2022 <br />Project Number: RC2292-G1 Length: 0.16 miles <br />Basis for Project: Safety Improvements/Countermeasures Construction: 2023 <br />Project Description: <br />Vantage Highway is an essential east-west roadway serving residential, agricultural, and commercial trafÕc. Bridge structure <br />#89342 is located approximately 0.3 miles west of Fairview Road. This structure consists of 16 treated wood stringers. Based <br />on calculations this was rated as load restricted in 2021. This structure was also damaged by a vehicle impact in 2021. Work <br />will include replacement of the bridge with a much larger structure to meet current design standards. <br />Status: Planned for design and Right of Way in 2022 and construction in 2023. <br />TrafÕc Impacts: TBD <br />For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us <br />Vantage Hwy – Cascade Canal <br />Bridge Replacement <br />Funding Source: <br />STBG $249,000 <br />Total: $249,000 <br />10
The URL can be used to link to this page
Your browser does not support the video tag.