Laserfiche WebLink
<br />CRP/RC #: 304-20 <br />Resolution #: 2021-071 <br />Location: MP 0-MP 1.74 H Junction Rd, Ellensburg <br />Last Updated: 8/29/2022 <br />Hungry Junction Road <br />Widening <br />Basis for Project: Reconstruction and Safety Construction: 2024 <br />Project Description: <br />Hungry Junction Rd from US 97 to Reecer Creek Rd is narrow with having vertical curves that do not provide adequate sight <br />distance. The road has moderate truck trafÕc from a local hay processing facility. The work will include changing the vertical <br />curve proÕle to comply with WSDOT design manual, widening and paving the road to increase paving structure. <br /> <br />Status: Design and Right of Way phases 2022-2023, with construction in 2024-2025 <br />TrafÕc Impacts: To be determined with design. <br />For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us <br />Project Number: RC2093-RP Length: 1.74 miles <br />Funding Sources: <br />Planned RAP <br />funds <br />$3,581,000 <br />Local Funds $520,000 <br />Total: $4,101,000 <br />Hungry Junction looking east Hungry Junction Rd-Siphon <br />5