Laserfiche WebLink
<br />CRP/RC #: 315-22 <br />Resolution #: 2022-156 <br />Location: MP 0.24 Cooke Canyon Rd, Ellensburg <br />Last Updated: 8/29/2022 <br />Cooke Canyon Rd Bridge <br />Replacement <br />Basis for Project: Bridge Replacement Construction: 2023-2024 <br />Project Description: <br />Bridge #80181 on Cooke Canyon Road at MP 0.24 over the Hiline Canal is currently load restricted and structurally deÕcient. <br />Work will include replacement of the bridge with a much larger structure to meet current design standards. <br />Status: Design and Right of Way phases 2022-2023, with construction in 2023-2024 <br />TrafÕc Impacts: To be determined with design. <br />For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us <br />Project Number: RC2194-BR Length: 0.01 mile <br />Funding Sources: <br />Local Bridge <br />Program <br />$2,312,000 <br />Local Funds $361,000 <br />Total: $2,673,000 <br />Cooke Canyon Rd looking north Eroding concrete girder <br />6