Laserfiche WebLink
<br />CRP/RC #: <br />Location: Cle Elum to Easton <br />Last Updated: 8/29/2022 <br />* WSDOT project <br />Project Number: RC2290-ST Length: Approximately 7.0 miles <br />Basis for Project: Improve Capacity and Safety Construction: TBD <br />Project Description: <br />High bypass trafÕc volumes through Upper County is a concern for residents and the condition of roads. This increase in traf- <br />Õc when I-90 is busy results in degraded roadways as well as increased safety concerns. In order to pursue funding, a project will need to be on the State Transportation Improvement Plan (STIP). This is initial funding to place the project on the plan <br />and allow for future federal funding. <br /> <br />Status: Feasibility study underway. <br />TrafÕc Impacts: TBD <br />For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us <br />Funding Source: <br />Local <br />Funds <br /> $750,000 <br />Total: $750,000 <br />I-90 Widening– Eastbound <br />and Westbound 4