My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023 - 2028 Six-Year Capital Improvement Plan
>
Meetings
>
2022
>
12. December
>
2022-12-20 2:00 PM - 2:00pm Public Hearing
>
2023 - 2028 Six-Year Capital Improvement Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2022 12:19:36 PM
Creation date
12/15/2022 12:17:12 PM
Metadata
Fields
Template:
Meeting
Date
12/20/2022
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Public Hearing to consider Capital Improvement Program for the Planning Period 2023-2028.
Order
2
Placement
2:00pm Public Hearing
Row ID
97391
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CRP/RC #: <br />Location: Various <br />Last Updated: 8/29/2022 <br /> <br />Project Number: Length: TBD <br />Basis for Project: Safety Construction: 2026 <br />Project Description: <br />Kittitas County has 156 routinely inspected structures having a length under 20-feet. These structures are not eligible for <br />Bridge Replacement Advisory Committee (BRAC) funding, as such, it is the County’s responsibility to maintain or replace these structures with County Funds. Based on Õeld reviews many of these structures need signiÕcant repairs or to be re- <br />placed. This phase begins to address the need to repair or replace these structures. Multiple phases will be required to ad-dress all structures. <br />Status: Planned. Planned for design in 2025 and construction in 2026. <br />TrafÕc Impacts: TBD <br />For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us <br />Funding Source: <br />Planned <br />STBG <br />Local funding <br /> $900,000 <br /> <br />$500,000 <br />Total: $1,400,00 <br />0 <br />Short Span Bridge Replacement- <br />Phase 1 19
The URL can be used to link to this page
Your browser does not support the video tag.