Laserfiche WebLink
<br />CRP/RC #: <br />Location: MP 2.25– MP 2.4 Cle Elum <br />Last Updated: 8/29/2022 <br /> <br />Project Number: Length: 0.15 miles <br />Basis for Project: Drainage Improvement/Flood Reduction Construction: 2028 <br />Project Description: <br />Undersized irrigation culverts under Airport Road in Cle Elum have increased drainage issues in the area. Replacement of <br />these undersized culverts with larger, adequate culverts will decrease Öooding issues for nearby property owners while also protecting the roadway from damage. Construction funding anticipated in 2028. <br /> <br />Status: Planned. Planned for design and Right of Way in 2027 and construction in 2028. <br />TrafÕc Impacts: TBD <br />For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us <br />Funding Source: <br />Local <br />funding <br /> $1,290,000 <br />Total: $1,290,000 <br />Airport Road (Cle Elum) <br />Culvert Replacement 18