Laserfiche WebLink
<br />CRP/RC #: <br />Location: MP 0.0 to MP 0.57 Ellensburg <br />Last Updated: 8/29/2022 <br /> <br />Project Number: Length: 0.57 miles <br />Basis for Project: Rehabilitation and Maintenance Construction: 2026 <br />Project Description: <br />Local hay pressing operations have deteriorated existing asphalt roadway resulting in pavement rutting conditions. An HMA <br />overlay will remediate the rutted condition and restore the roadway segment. The road segment will be widened to accommo-date the larger truck loads entering and exiting hay press facility. <br /> <br />Status: Planned. Planned for design in 2025 and construction in 2026. <br />TrafÕc Impacts: TBD <br />For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us <br />Funding Source: <br />Local <br />funding <br /> $1,640,000 <br />Total: $1,640,000 <br />Badger Pocket Rd <br />HMA Overlay 20