My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-08-08-minutes-public-works-study-session
>
Meetings
>
2022
>
09. September
>
2022-09-06 10:00 AM - Commissioners' Agenda
>
2022-08-08-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2022 1:10:45 PM
Creation date
9/1/2022 1:10:04 PM
Metadata
Fields
Template:
Meeting
Date
9/6/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
93293
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. Prepare preliminary 90% plan set (12 sheets assumed). <br />12. Provide five (5) sets of the 60% and 90% documents. One (1) set of each to be sent to FAA. Allow four <br />(4) weeks for FAA review of the 90% documents. <br />13. Prepare preliminary (90%) engineer's design report to the established FAA requirements (FAA standard <br />handout 620-04). <br />14. Submit Engineer's Preliminary Design Report and 90% documents <br />15. The project manager and project engineer will attend a 90% virtual review meeting with the County to <br />discuss the 90% design. <br />DELIVERABLES: <br />• <br />60% and 90% level plans (PDF) <br />• 60% and 90% level project manual of bidding documents (PDF) <br />• 60% and 90% level engineer's estimate (PDF) <br />• 90% Construction Safety and Phasing Plan (CSPP) (PDF) <br />TASK 7 — Final Design <br />1. Review intermediate level review comments from the County; address and respond to comments. <br />2. Non -FAA agency comments or conditions of approval (from USACE, USFWS, or otherwise) will be responded <br />to, and incorporated into the bid documents as necessary. <br />3. Based on FAA comments, prepare final CSPP. <br />4. Prepare final plans. 12 plan sheets are anticipated. <br />5. Prepare final project manual of bidding documents and specifications. <br />6. Prepare final construction cost estimate. <br />7. Compile final submittal package and submit to the County for advertisement of bids. Bid documents will be <br />sent to FAA as well. <br />8. Prepare FAA AIP grant closeout documentation in accordance with FAA Order 5100.38D. <br />DELIVERABLES: <br />• Final plans (PDF) <br />• Final project manual of bidding documents (PDF) <br />• Final engineer's estimate (PDF) <br />• Final Construction Safety and Phasing Plan (CSPP) (PDF) <br />TASK 8 — Bid Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.