My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-08-08-minutes-public-works-study-session
>
Meetings
>
2022
>
09. September
>
2022-09-06 10:00 AM - Commissioners' Agenda
>
2022-08-08-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2022 1:10:45 PM
Creation date
9/1/2022 1:10:04 PM
Metadata
Fields
Template:
Meeting
Date
9/6/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
93293
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Consolidate and upload bidding documents to Quest CDN bid documents website. <br />2. Provide an advertisement for the public bidding of the project. The County will send the Invitation to Bid to <br />media outlets for advertisement, and pay advertising fees. <br />3. Provide project coordination with the County throughout the bidding period. <br />4. Review, research, and prepare answers to technical questions during bidding. <br />5. Prepare addenda as necessary to clarify bid documents. Addenda will be distributed by the Engineer. For <br />scoping purposes this scope assumes two addenda will be prepared. Addenda will be consolidated into one <br />pdf electronic file and uploaded to the Quest CDN website. <br />6. Coordinate, attend, and facilitate a pre-bid conference forthe project at the airport. Prepare meeting agenda, <br />sign -in sheet. The Project Manager will attend the pre-bid conference. <br />7. The County will facilitate the bid opening and provide the Engineer with copies of all bid packages received. <br />8. Prepare bid tabulation and prepare a Bid Analysis Letter to the Airport for award of bid. It is assumed the <br />County will issue the Notice of Award letter. <br />DELIVERABLES: <br />• PDF bid documents for upload to Quest CDN website <br />• Bid tabulation/Bid Analysis Letter <br />• Recommendation of Award Letter <br />EXCLUSIONS: <br />The following items are excluded from this scope, but as necessary will be included in a subsequent contract task order. <br />Excluded work items include: <br />• Construction inspection services <br />• Wetland mitigation monitoring services <br />ASSUMPTIONS: <br />• Geotechnical investigations collected as part of the Environmental Assessment (ELN AIP -015) will be relied upon <br />to inform the design of this project <br />• An initial assessment of the viability and justification for on-site mitigation was conducted as part of the EA. This <br />information was described in a memo titled Justification for Wetland Mitigation at Bowers Field (ELN) dated <br />December 9, 2021 written by Jacobs Engineering for Kittitas County and the information and mitigation concept <br />presented in this memo will be utilized and advanced for this design project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.