Laserfiche WebLink
1. Consolidate and upload bidding documents to Quest CDN bid documents website. <br />2. Provide an advertisement for the public bidding of the project. The County will send the Invitation to Bid to <br />media outlets for advertisement, and pay advertising fees. <br />3. Provide project coordination with the County throughout the bidding period. <br />4. Review, research, and prepare answers to technical questions during bidding. <br />5. Prepare addenda as necessary to clarify bid documents. Addenda will be distributed by the Engineer. For <br />scoping purposes this scope assumes two addenda will be prepared. Addenda will be consolidated into one <br />pdf electronic file and uploaded to the Quest CDN website. <br />6. Coordinate, attend, and facilitate a pre-bid conference forthe project at the airport. Prepare meeting agenda, <br />sign -in sheet. The Project Manager will attend the pre-bid conference. <br />7. The County will facilitate the bid opening and provide the Engineer with copies of all bid packages received. <br />8. Prepare bid tabulation and prepare a Bid Analysis Letter to the Airport for award of bid. It is assumed the <br />County will issue the Notice of Award letter. <br />DELIVERABLES: <br />• PDF bid documents for upload to Quest CDN website <br />• Bid tabulation/Bid Analysis Letter <br />• Recommendation of Award Letter <br />EXCLUSIONS: <br />The following items are excluded from this scope, but as necessary will be included in a subsequent contract task order. <br />Excluded work items include: <br />• Construction inspection services <br />• Wetland mitigation monitoring services <br />ASSUMPTIONS: <br />• Geotechnical investigations collected as part of the Environmental Assessment (ELN AIP -015) will be relied upon <br />to inform the design of this project <br />• An initial assessment of the viability and justification for on-site mitigation was conducted as part of the EA. This <br />information was described in a memo titled Justification for Wetland Mitigation at Bowers Field (ELN) dated <br />December 9, 2021 written by Jacobs Engineering for Kittitas County and the information and mitigation concept <br />presented in this memo will be utilized and advanced for this design project. <br />