My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2022-064
>
Meetings
>
2022
>
03. March
>
2022-03-01 10:00 AM - Commissioners' Agenda
>
Res-2022-064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 12:25:11 PM
Creation date
4/1/2022 12:25:04 PM
Metadata
Fields
Template:
Meeting
Date
3/1/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
f
Item
Request to Approve a Resolution Authorizing the Chair's Signature on Task Order #11 with Century West for Construction of a New Airport Taxilane
Order
6
Placement
Consent Agenda
Row ID
86539
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e) Prepare a draft Stormwater Site Plan report and submit to the County for revlew. Provide draft via email in <br />PDF forrnat. <br />f) Coordinate and address review comments and incorporate changes into draft report. <br />B) Prepare a final Stormwater Site Plan report and submit to the County for approval. Provide repon via email <br />in PDF format. <br />6,7 Prepare a pavement marking design for the taxilane <br />6.8 Prepare typicaf sections, paving details, and rniscellaneous details required for construction. <br />6.9 Prepare a preliminary erosion control plan and details. Erosion and sediment control plan will meet <br />Washington Department of Ecology guidelines. <br />5.10 Prepare intermediate plans for the taxilane constructaon. 16 plan sheets are anticipated; these include: <br />. Cover Sheet (rl <br />r Site Survey & Control Plan (l) <br />. Construction Safety & Phasing Plan {1}. Construction Safety& Phasing Notes and Details {1)r Demolition Plan {1}o Erosion Control Plan {1)r Erosion Control Notes & Details (1) <br />c Taxilane Plan/Profile {2). Typlcal Pavement Sections (1) <br />r Grading Sections (2) <br />r MarkinB Plan & Marking Details (1.) <br />. Stormwater & Subdrainate Site Plan & Details {2). Pavement Ma*ing Plan & Details (1) <br />6.11 Prepare intermediate level project manual of bidding documents and specifications. <br />Bidding documents will include bidding/contract specifications, general and speclal provisions, technical <br />provisions, and other related sections and forms. <br />Specifications will be developed using Advbory Circula r 150/5370 10 (latest edition), Standards for <br />Specifying Construction of Airports and any boilerplate front end specifications provided by the County. <br />6.12 Prepare intermediate level enginee/s estimate for the cost of construction. <br />6.13 Compile lntermediate level submittal package and submit to the County for review electronically. <br />5.14 Conduct in.house aA/QC review of intermediate level submittal documents. <br />6.15 Consultant will lead an intermediate review meeting (via phone or web conference) with the County to <br />review the intermediate design - plans, specifications, and project cost. <br />DETIVERAETES: <br />r lntermediate level plans (PDF) <br />. lntermediate level project manual of bidding documents (PDF) <br />r lntermediate level englneer's estimate (PDF| <br />a <br />a <br />4
The URL can be used to link to this page
Your browser does not support the video tag.