5.2 Prepare pavement design identifying the pavement section for the new taxilane. <br />5.3 Prepare a conceptual level cost estamate for each of the alternatives developed ln Task 5.1. <br />5.4 Conduct a review meeting with the County to discuss the alternatives and identify the preferred alternative, <br />DETIVERABTES: <br />e Plan sheet of each concept level alternative (up to three aftematives) <br />. Pavement section design <br />r Construction cost estimate for each alternative {up to three alternatives} <br />TASK 6 - lntermedlate Design <br />Prepare an intermediate level design of the preferred alternative. lntermediate design will include the following: <br />5.1 Finalizehorizontallayoutofpreferredalternativeandprepareverticalgradedesignandtransitlonstoexisting <br />pavement tie ins. <br />6.2 Prepare draft Construction Safety and Phasing Plan {CSPP) and draft 7460. 7460 will be prepared for <br />temporary construction impacts and the perrnanent condition. Upload the CSPP and 7460 to the OEIAAA <br />portal for review by all FAA offices. <br />6.3 Prepare preliminary construction phasing/safety/work area plan drawings to be incorporated into the <br />construction plans set. <br />6.4 Perform engineering for development of the taxilane pavlng and grading plans. <br />5.5 Prepare a demolition design to identlfy and depict items scheduled for removal. <br />6.6 As necessary p€r County requirements determined in the task 4 County pre-application meeting, prepare a <br />drainage design and draft drainage site plan technical report for the taxilane construction. Drainage design <br />and report will be per Xittitas County requirements. lt is assumed that drainage doign is limited to surface <br />runoff to infield grades, and water quality treatment is achieved by filter strips and/or infiltration Eest <br />Management Practices (BMPs). lt is assumed that stormwater conveyance, flow control, and detention is ng! <br />required for this project. <br />lf required by the County the limited Stormwater Site Plan will be prepared for the project improvements <br />based on the requirements of the Oepartment of Ecology Stormwater Management Manual for Eastern <br />Washington. Stormwater design elements may require and are limlted to the following items: <br />aI Perform a site analysis uslng existing documents and reports, and evaluation of existing site conditions. <br />b) Using the findings of the site analysis and guidance of the regulating documents determine the applicable core <br />drainage elements for this project. <br />c) Prepare a preliminary and final design of the permanent stormwat€r syste.n 8MPs. <br />d) As necessary and determined a5 part of task 5,4, prepare a preliminary and final design of a subdrainage <br />system to protect the reconstructed pavement section. <br />l